Final | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | CANC |
Rock A. Hudson
|
|
|
Please provide an inspection of the temporary service. Call John with any questions ###-####. Thank you and have a wonderful day! Phone #: ###-#### >> Inspection requested via web by Kevin Perez Needed temp service
|
Temporary Service | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | PASS |
Rock A. Hudson
|
|
|
Please provide an inspection of the temporary service. Call John with any questions ###-####. Thank you and have a wonderful day! Phone #: ###-#### >> Inspection requested via web by Kevin Perez t/s o/h n ok
|
Final | 4/24/2013 | 4/24/2013 | 4/24/2013 | A | CANC |
Rock A. Hudson
|
|
|
Please inspect the temporary service for connection by Idaho Power. If you have any questions please contact John Rowles ###-####. Phone #: ###-#### >> Inspection requested via web by Kevin Perez Neede temp service insp.
|
Temporary Service | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Please inspect the temporary service for connection by Idaho Power. If you have any questions please contact John Rowles ###-####. Phone #: ###-#### >> Inspection requested via web by Kevin Perez 250.24(A)(1)-The grounding electrode conductor connection shall be made at any accessible point from the load end of the service drop to and including the terminal or bus to which the grounded service conductor is connected at service disconnecting means.
|
Electrical Rough-In | 4/23/2013 | 4/23/2013 | 4/23/2013 | A | PASS |
Daryl DeGrange
|
|
|
Underground inspection for temporary service... Electrician John Rowles Cell ####-#### Phone #: ###-#### >> Inspection requested via web by Kevin Perez rough-in ok cover underground
|