Final | 7/28/2014 | 7/29/2014 | 7/29/2014 | A | PASS |
Rock A. Hudson
|
|
|
Men and women''s bathroom Phone #: ###-#### >> Inspection requested via web by Bryan Atkins Called to confirm all areas needing finalled. final ok
|
Electrical Rough-In | 4/9/2014 | 4/10/2014 | 4/10/2014 | A | PASS |
Rock A. Hudson
|
|
|
ADA Restroom Phone #: ###-#### >> Inspection requested via web by Bryan Atkins Bathrooms near cashers on 1st floor rough in ok cover
|
Electrical Rough-In | 5/9/2013 | 5/10/2013 | 5/10/2013 | A | PASS |
Bob Reichert
|
|
|
Ceiling Rough in. Wade on site. Phone #: ###-#### >> Inspection requested via web by Bryan Atkins ok cover ceiling, ok use handi box in high bay area
|
Electrical Rough-In | 4/22/2013 | 4/23/2013 | 4/23/2013 | P | PASS |
Daryl DeGrange
|
|
|
Framing Rough-in Phone #: ###-#### >> Inspection requested via web by Bryan Atkins South building rough-in ok cover walls and hard lid in bathrooms
|