Temporary Service | 4/29/2013 | 4/30/2013 | 4/30/2013 | A | PASS |
Rock A. Hudson
|
|
|
Temp Power Phone #: ###-#### >> Inspection requested via web by Zane Robertson t/s u/g n ok
|
Temporary Service | 4/26/2013 | 4/29/2013 | 4/29/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Temp Power Phone #: ###-#### >> Inspection requested via web by Zane Robertson 250.24(A)(1)- The grounding electrode conductor shall connect at the same terminal or bus as the grounded conductor
|