Final | 6/5/2013 | 6/5/2013 | 6/5/2013 | A | PASS |
Rock A. Hudson
|
|
|
Final for bathroom, added fan, switches. Building should be open, if not front door, far left is open, door is sticky, push with foot at very bottom, door will open. Phone #: ###-#### >> Inspection requested via web by Kurt Carlson Final ok
|
Electrical Rough-In | 5/8/2013 | 5/9/2013 | 5/9/2013 | P | PASS |
Rock A. Hudson
|
|
|
Added exhaust fan, relocated and added switches, modified existing receptacle. Front door, far left, will be unlocked, door is sticky push in at bottom. Bathroom is to rear of house. Phone #: ###-#### >> Inspection requested via web by Kurt Carlson Main floor back bathroom remodel rough in ok cover
|