Final | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga
|
Final | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PART |
Eric Story
|
|
|
Corrections done Phone #: ###-#### Inspection requested via web by Greg Idsinga Corrections fixed final ok
|
ELE-Aging Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 | | DONE |
Eric Story
|
|
|
Gregg said he would finish job and call in for a final
|
ELE-Aging Inspection | 3/7/2018 | 3/7/2018 | 3/8/2018 | | DONE |
Eric Story
|
|
|
Still waiting on Gregg to verify if complete and when access can be granted
|
ELE-Aging Inspection | 12/6/2017 | 12/6/2017 | 12/13/2017 | | CANC |
Eric Story
|
|
|
Too busy
|
ELE-Aging Inspection | 9/6/2017 | 9/6/2017 | 9/6/2017 | | CANC |
Eric Story
|
|
|
Still under construction
|
ELE-Aging Inspection | 6/7/2017 | 6/7/2017 | 6/7/2017 | | DONE |
Eric Story
|
|
|
Still under construction
|
ELE-Aging Inspection | 2/14/2017 | 2/14/2017 | 2/22/2017 | | DONE |
Eric Story
|
|
|
Gregg said he would get the work complete and will call in for a final
|
ELE-Aging Inspection | 7/12/2016 | 7/12/2016 | 7/14/2016 | | CANC |
Rock A. Hudson
|
|
|
|
ELE-Aging Inspection | 4/12/2016 | 4/12/2016 | 4/13/2016 | | DONE |
Rex Boyles
|
|
|
no time
|
ELE-Aging Inspection | 1/12/2016 | 1/12/2016 | 1/13/2016 | | DONE |
Rex Boyles
|
|
|
too busy
|
ELE-Aging Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 | | DONE |
Rex Boyles
|
|
|
Greg will call this in soon
|
ELE-Aging Inspection | 7/14/2015 | 7/14/2015 | 7/20/2015 | | DONE |
Rex Boyles
|
|
|
too busy
|
Final | 2/20/2014 | 2/20/2014 | 2/20/2014 | A | FAIL |
Daryl DeGrange
|
|
|
Outside all in one was re-energized. Phone #: ###-#### >> Inspection requested via web by Greg Idsinga NEC 352.30 (A) PVC shall be securely fastened within 3 ft. of each conduit termination NEC 408.4 Panel requires completd directory
|
Permanent Service | 5/23/2013 | 5/23/2013 | 5/23/2013 | P | PASS |
Daryl DeGrange
|
|
|
Greg Phone #: ###-#### p/s u/g rec ok
|