Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberELE13-01291
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 1000 W MYRTLE ST
Project NameJUMP
Customer Number 
ePlanReviewNo
Description
Installing conduit in concrete and concrete slab for jump structure per initial per cert of value $50,000///BAS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/26/20183/27/20183/27/2018PPASS
DetailsRock A. Hudson
Please contact John Mittleider for questions regarding inspection details.
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
Final ok
ELE-Aging Inspection1/11/20181/11/20181/11/2018 PASS
DetailsRock A. Hudson
Still under construction
Electrical Rough-In10/12/201710/13/201710/13/2017APASS
DetailsRock A. Hudson
Call John for fountain bonding on site. Phone #: ###-#### Inspection requested via web by Tom Betty
Perimeter walls bonding rough in ok cover
Electrical Rough-In9/19/20179/20/20179/20/2017PPASS
DetailsRock A. Hudson
Call John for fountain bonding. Phone #: ###-#### Inspection requested via web by Tom Betty
Provisions provided for bonding perimeter benches, water line just past drains. Conduits under this area are for low voltage lighting associated with pool.
All metal associated with pour bonded, drains, caps, rebar. Perimeter walls to be opened up to expose rebar for bonding and equipment will be in basement under silo to west. Bonding rough in ok cover
Electrical Rough-In9/19/20179/19/20179/19/2017PNR
DetailsRock A. Hudson
Contact John for bonding of fountain on site. Phone #: ###-#### Inspection requested via web by Tom Betty
Requested for wrong day installation not complete. Will recall
Electrical Rough-In9/12/20179/12/20179/12/2017PPASS
DetailsRock A. Hudson
Contact John to inspect light pole base on southwest corner of site park. Phone #: ###-#### Inspection requested via web by Tom Betty
Rough in ok cover
Electrical Rough-In8/17/20178/21/20178/22/2017AFAIL
DetailsRock A. Hudson
Contact John for heat trace rough in and talk bonding at water feature on park site. Phone #: ###-#### Inspection requested via web by Tom Betty
Discussed requirements for new water feature between Annex and HQ. If standing water and public has access to wade in water pool requirements of article 680 apply. Contact stated this body of water is to have public access for wading. All Code requirements for a pool apply.
680.11- Underground is wiring is not permitted under a pool unless this wiring is necessary to supply pool equipment.
680.26(A)- The equipotential bonding required by 680.26 shall be installed to reduce voltage gradients in the pool area including 3 existing perimenter walls.
680.27(C)(3)- Radiant heating cables are not permitted under or in pool deck.
Electrical Rough-In8/2/20178/3/20178/3/2017APASS
DetailsRock A. Hudson
Call john for underground raceways on site. Phone #: ###-#### Inspection requested via web by Tom Betty
Tractor pad S.W. corner and additional length towards S.W. corner not yet to final location rough in ok cover
Final7/28/20177/31/20177/31/2017AFAIL
DetailsRock A. Hudson
Walk down fountain controls and spiral slide on exterior of building. Phone #: ###-#### Inspection requested via web by Tom Betty 110.3- Shall verify listing of spiral slide and components. Found listing for control cabinet, verify if all are part of same listing.
680.26(B)(2)- Although water feature does not meet the definition of a pool, AHJ shall require bonding of perimeter surfaces and equipment associated due to wet concrete in area of foggers. If accessible #8 solid continue to equipment from shells as inspected in June of 2016 and shall include electrical equipment discribed in 680.26(B)(6).
400.17- Power supply cord entering control cabinet shall be protected from physical damage where it enters or be relocated to interior.
Final7/20/20177/20/20177/20/2017PPART
DetailsRock A. Hudson
Contact Tony Keen for sign off of level 5 deck JUMP structure. No final for JUMP site/park. Phone #: ###-#### Inspection requested via web by Tom Betty
Parking garage slides and sight mister fountain listings need confirmed. Central area and several tractor boxes with power and lighting yet to be built.
Level 5 play area, BBQ area TCO ok
Electrical Rough-In5/22/20175/23/20175/23/2017PPASS
DetailsRock A. Hudson
Please inspect the next site amphitheater wall rough in raceways and boxes. Phone #: ###-#### Inspection requested via web by Tom Betty
Level 7 pour rough in ok cover
Electrical Rough-In5/12/20175/15/20175/15/2017PPASS
DetailsRock A. Hudson
Please inspect pvc in wall #6 of the amphitheater. Phone #: ###-#### Inspection requested via web by Tom Betty Area noted rough in ok cover
Electrical Rough-In5/5/20175/8/20175/8/2017APASS
DetailsRock A. Hudson
Please inspect amphitheater wall #5. Please walk with Tony to sign off hard card on Simplot Headquarters past inspection. Phone #: ###-#### Inspection requested via web by Tom Betty
Unable to sign on vanilla space under BLD16-03847. A seperate electrical permit required.
Level 5 of ampitheater rough in ok cover.
Electrical Rough-In4/28/20174/28/20174/28/2017PPASS
DetailsRock A. Hudson
Rough in inspection on amphitheater wall #4 only at JUMP site. Contact Tony Keen if escort is needed. Phone #: ###-#### Inspection requested via web by Tom Betty
Level 4 pour amphitheater rough in ok cover
Electrical Rough-In4/20/20174/20/20174/20/2017APASS
DetailsRock A. Hudson
Call Tony Keen for concrete wall rough in at amphitheater in park area. Phone #: ###-#### Inspection requested via web by Tom Betty
Level 3 of sitting area, tractor pad and planter underground to south of HQ rough in ok cover
Electrical Rough-In4/13/20174/14/20174/14/2017PPASS
DetailsRock A. Hudson
Call Tony Keen for rough in concrete pour on site. Phone #: ###-#### Inspection requested via web by Tom Betty
Sitting area of ampatheater level 2 wall pour rough in ok cover
ELE-Aging Inspection3/16/20173/16/20173/16/2017 PASS
DetailsRock A. Hudson
Still under construction
Electrical Rough-In12/14/201612/14/201612/14/2016PPASS
DetailsRock A. Hudson
site underground. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Underground south stack 4 and ampatheater wall rough in ok cover
Electrical Rough-In11/3/201611/3/201611/3/2016PPASS
DetailsRock A. Hudson
underground site. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
HQ south columns stack 1 column lights rough in ok cover
Electrical Rough-In10/31/201611/1/201611/1/2016APASS
DetailsRock A. Hudson
site underground. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
South area west of tractors to narrow section underground rough in ok cover
Electrical Rough-In10/24/201610/25/201610/25/2016APASS
DetailsRock A. Hudson
site underground. Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Small area to S.W. of tractors in ampatheater area underground rough in ok cover
Electrical Rough-In10/21/201610/21/201610/21/2016PPASS
DetailsRock A. Hudson
site underground. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Area to west of tractors in ampatheater underground rough in ok cover
Electrical Rough-In10/17/201610/17/201610/17/2016PPASS
DetailsRock A. Hudson
underground site. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Discussed progress on south egress lighting for stair 1. I was informed site crew not providing egress lighting. Asked site crew meet with building electrical foreman and double check who is providing lighting for egress as it is required.
Partial underground south side west of tractors rough in ok cover.
Electrical Rough-In10/14/201610/14/201610/14/2016PCANC
DetailsRock A. Hudson
underground site. call Frank Phone #: ###-#### >> Inspection requested via web by Brandon Robinson Inspection cancelled from web by: Brandon Robinson
Electrical Rough-In10/10/201610/11/201610/11/2016APASS
DetailsRock A. Hudson
site underground inspection. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Water feature area to be future inspection. Area south of Annex breezeway underground rough in ok cover
Electrical Rough-In10/7/201610/7/201610/7/2016PPASS
DetailsDaryl DeGrange
underground inspection on site. Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson Rough-in ok cover 3 pole bases stack area 4 level 1 east exit
Electrical Rough-In9/29/20169/29/20169/29/2016APASS
DetailsRock A. Hudson
site underground. Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Area between HQ and Annex underground and south pole bases rough in ok cover
Electrical Rough-In9/28/20169/28/20169/28/2016PPASS
DetailsRock A. Hudson
underground between HQ building and Annex building. Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
South side of HQ and east 1/2 off annex underground rough in ok cover.
Conference9/19/20169/20/20169/20/2016ADONE
DetailsRock A. Hudson
Tony ###-####. Flag pole bases.
Contractor investigated base construction and rebar of flag pole base connected to building rebar system. Additional electrode not required as complete area installed above water membrane so true earth not available by installation of ground rods. Installation as is is sufficient.
Conference9/19/20169/19/20169/19/2016PDONE
DetailsRock A. Hudson
Contact Tony about flag pole lightning protection. Phone #: ###-#### Inspection requested via web by Tom Betty
Discussed the design of base for flag poles which had a 24" electrode to be installed at bottom of flag pole base. At bottom of base, 5' depth, roof of lower parking garage structure is present so installers decided to remove 24" electrode and install it on side of flag pole base. Will discuss with chief electrical and building and will ote 9-20-16.
Electrical Rough-In9/9/20169/12/20169/12/2016APASS
DetailsRock A. Hudson
underground south of Annex. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson one pole base not ready area noted ok to cover. 3 north flag pole ground rods verify length and specs
Electrical Rough-In8/27/20168/29/20168/29/2016PPASS
DetailsRock A. Hudson
Northwest corner site underground. Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Area noted rough in ok cover
Electrical Rough-In8/26/20168/26/20168/26/2016PNR
DetailsRock A. Hudson
site underground northwest corner. call Frank. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Will recall
Electrical Rough-In6/29/20166/29/20166/29/2016PPASS
DetailsRock A. Hudson
underground event lawn. Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
West of event lawn area underground rough in ok cover
Electrical Rough-In6/22/20166/23/20166/23/2016APASS
DetailsRock A. Hudson
event lawn underground rough in. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Underground north and west of ELE room rough in ok cover. Duplicate request
Electrical Rough-In6/22/20166/23/20166/23/2016APASS
DetailsRock A. Hudson
event lawn underground rough in. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson Underground north and west of ELE room rough in ok cover
Electrical Rough-In6/21/20166/21/20166/21/2016PPASS
DetailsRock A. Hudson
event lawn underground inspection on site. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
South central from electrical room underground rough in ok cover
Electrical Rough-In6/17/20166/17/20166/17/2016PPASS
DetailsRock A. Hudson
underground inspection in event lawn. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Underground north and east corners rough in ok cover
Electrical Rough-In6/3/20166/6/20166/6/2016PPASS
DetailsRock A. Hudson
underground pole light inspection on front street and 9th. Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
6 pole bases north side from 9th to 11th rough in ok cover
Electrical Rough-In6/1/20166/2/20166/2/2016APASS
DetailsRock A. Hudson
electrical rough in inspection for event lawn underground near corner of 9th and front . Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
South portion of event lawn underground rough in ok cover
Electrical Rough-In6/1/20166/1/20166/1/2016PPASS
DetailsRock A. Hudson
Contact Brandon for water fountain bonding. Phone #: ###-#### Inspection requested via web by Tony Keen
Large fountain perimeter bond rough in ok cover
Electrical Rough-In5/31/20166/1/20166/1/2016APASS
DetailsRock A. Hudson
inspection on water feature bonding Phone #: ###-#### Inspection requested via web by Brandon Robinson
2 smaller fountains perimeter bonds rough in ok cover
Conference5/27/20165/27/20165/27/2016ADONE
DetailsRock A. Hudson
requesting a consultation for JUMP site water feature bonding. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Discussed bonding of area around fountain and foggers. Bonds required on rebar on each perimeter area to equipment and GFCI protection
Electrical Rough-In5/24/20165/25/20165/25/2016APASS
DetailsRock A. Hudson
underground site work inspection near 9th St. Call Frank at number above. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Underground N. E. of drains in vent lawn area rough in ok cover
Electrical Rough-In5/23/20165/23/20165/23/2016PPASS
DetailsRock A. Hudson
Light pole bases in the park area. Phone #: ###-#### Inspection requested via web by Tony Keen
6 additional small pole bases in park area rough in ok cover
Electrical Rough-In5/18/20165/19/20165/19/2016PPASS
DetailsRock A. Hudson
Rough in for northeast site underground. Contact Frank Yantis Phone #: ###-#### Inspection requested via web by Tony Keen N.W. corner planter and sidewalk underground rough in ok cover
Electrical Rough-In5/12/20165/12/20165/12/2016PPASS
DetailsRex Boyles
Contact Frank Yantis for pole base inspection as early as possible.
Thanks Phone #: ###-#### Inspection requested via web by Tony Keen r/i ok n. east "event lawn" (4) square pole bases and north side of annex bldg. exterior door control u. slab conduits 2-3/4"
ELE-Aging Inspection5/6/20165/6/20165/6/2016 DONE
DetailsRex Boyles
still under construction
Electrical Rough-In2/5/20162/5/20162/5/2016PCANC
DetailsRock A. Hudson
Contact Frank Yantis to inspect Boise city street lighting pedestal. Phone #: ###-#### Inspection requested via web by Tom Betty Needed permenant service inspection
Permanent Service2/5/20162/5/20162/5/2016PPASS
DetailsRock A. Hudson
Contact Frank Yantis to inspect Boise city street lighting pedestal. Phone #: ###-#### Inspection requested via web by Tom Betty Confirmed lighting pedistal inspection. Tagged from 1-13-16 inspection by Rex Boyles. 2 meters required. p/s u/g n ok
Conference2/2/20162/2/20162/2/2016PDONE
DetailsRex Boyles
Meet Frank Yantis by the large spiral slide on grade level for conference. Phone #: ###-#### Inspection requested via web by Tom Betty Discuss conduits feeding slide power and controls. OK to change to rigid conduit since elevation in depth changed
Electrical Rough-In1/13/20161/13/20161/13/2016ACANC
DetailsRex Boyles
Call Frank Yantsi for street lighting inspection. Phone #: ###-#### Inspection requested via web by Tom Betty needed p/s
Permanent Service1/13/20161/13/20161/13/2016PPASS
DetailsRex Boyles
Call Frank Yantsi for street lighting inspection. Phone #: ###-#### Inspection requested via web by Tom Betty street light and xmas light receptacle public works pedestal needs 2 meters p/s u/g n ok
Electrical Rough-In1/6/20161/7/20161/7/2016APASS
DetailsRex Boyles
Call Brandon to inspect all JUMP elect. rooms levels 1,2,3,4,5,6 for completness. Phone #: ###-#### Inspection requested via web by Tom Betty Final ok on all electrical rooms. Still need final inspections on unfinished party decks and marketplace areas, Slide electrical and Pioneer Path electrical not completed, all electric signs "by others" and parking control pedestal electrical wiring "by others" before "FINAL" inspection on whole Jump project.
Electrical Rough-In11/18/201511/18/201511/18/2015PPASS
DetailsRex Boyles
Contact Frank for site work underground. Phone #: ###-#### Inspection requested via web by Tom Betty r/i continue slab on slab ground level conduits ( rock climbing area) ok
Electrical Rough-In11/13/201511/16/201511/16/2015APASS
DetailsRex Boyles
Call Frank Yantis for site inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok slab on slab west of main electrical room level 1
Electrical Rough-In11/5/201511/5/201511/5/2015PPASS
DetailsRex Boyles
Please contact Frank Yantis. for underground site rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i 5 seating planters u.ground conduits ok to cover
Electrical Rough-In11/3/201511/4/201511/4/2015APASS
DetailsRex Boyles
Contact brandon for grade level site underground. Phone #: ###-#### Inspection requested via web by Tom Betty pole bases west r/i ok
Electrical Rough-In10/29/201510/30/201510/30/2015PPASS
DetailsRex Boyles
Contact Frank Yantis for underground rough in on site. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok slab on slab west and north of water feature ok
Electrical Rough-In10/29/201510/29/201510/30/2015PCANC
DetailsRex Boyles
Contact Frank Yantis for site underground rough in. Phone #: ###-#### Inspection requested via web by Tom Betty called in wrong date
Electrical Rough-In10/28/201510/29/201510/29/2015APASS
DetailsRex Boyles
Contact Frank Yantis for underground raceways on site. Phone #: ###-#### Inspection requested via web by Tom Betty underslab conduits ok at east of main electrical rm. and north of kitchen in helix r/i ok
Electrical Rough-In10/22/201510/22/201510/22/2015PPASS
DetailsRex Boyles
Contact Frank Yantis for underslab raceways Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok slab on slab parking garage area west of helix only 100%
Electrical Rough-In9/23/20159/24/20159/24/2015APASS
DetailsRex Boyles
Contact Frank Yantis for site rough in underground. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok u.ground for street lights 9th and myrtle
Electrical Rough-In9/14/20159/15/20159/15/2015APASS
DetailsRex Boyles
Contact Frank Yantis for underground rough in on grade level site. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok slab on slab marketplace east
Electrical Rough-In8/31/20158/31/20158/31/2015APASS
DetailsRex Boyles
Contact Brandon Robinson to review and sign temporary occupancy. Phone #: ###-#### Inspection requested via web by Tom Betty temporary occupancy ok 1st floor parking garage barricaded area ONLY up to 6th floor. Zach with Hoffman states they will barricade all areas at Myrtle Street entrance area still under construction prior to "temp. occup. ok" with Fire and Building inspectors
Final8/6/20158/11/20158/11/2015APART
DetailsRex Boyles
Contact Brandon Robinson for level 4 JUMP inspection Phone #: ###-#### Inspection requested via web by Tom Betty level 4 exterior final ok
Electrical Rough-In8/7/20158/7/20158/7/2015PPASS
DetailsRex Boyles
Contact Frank Yantis for underground raceways. Phone #: ###-#### Inspection requested via web by Tom Betty 2- 2" raceways feeding street lights on myrtle ok to cover
Electrical Rough-In7/29/20157/30/20157/30/2015PPASS
DetailsRex Boyles
PLease contact Frank Yantis for a 1:00 p.m. inspection of light poles on 9th and Myrtle sts. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok 2 light pole bases on 9th street and u. ground conduits
Electrical Rough-In7/29/20157/29/20157/29/2015PCANC
DetailsRex Boyles
Contact Frank Yantis for pole base rough in on Myrtle and 9th st. as close to 3:00 p.m. as possible please. Phone #: ###-#### Inspection requested via web by Tom Betty Tony called and cancelled this inspection
Final7/27/20157/27/20157/27/2015PPART
DetailsRex Boyles
Contact Brandon Robinson for level 1 helix final inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i slab on slab north of helix ground lights and slab on slab u.ground at helix ramp
Final7/23/20157/23/20157/23/2015PPART
DetailsRex Boyles
Contact Brandon Robinson for level 3 parking garage final inspection. Phone #: ###-#### Inspection requested via web by Tom Betty level 3 parking garage final ok ALSO r/i ok level 1 underground slab on slab north of helix
Electrical Rough-In7/17/20157/17/20157/17/2015PPASS
DetailsRex Boyles
Contact Frank Yantis for level 1 underground and level 4 final. Phone #: ###-#### Inspection requested via web by Tom Betty 2 INSPECTIONS; r/i ok 1st floor slab on slab conduits from garage north to kitchen area. FINAL OK 4th flr interior of helix
Final7/13/20157/16/20157/16/2015APART
DetailsRex Boyles
PLease contact Brandon Robinson for level 6 ; 7 inspection. Phone #: ###-#### Inspection requested via web by Tom Betty final ok corrections made for 1st floor kitchen island and lockoffs on hand dryers and GFCI protection on drinking fountains and all 120 volt receptacles , 2nd floor sound wall in office, 6th floor 100% and all rooftop on 7 and 8. All exterior GFCI's are now W.R. and ok
Final7/13/20157/15/20157/15/2015APART
DetailsRex Boyles
PLease contact Brandon Robinson for level 5 inspection. Phone #: ###-#### Inspection requested via web by Tom Betty level 5 helix final ok EXCEPT exterior planters, slide and party zone area not ready. ALSO r/i ok for Portal walls and soffit sconces
Electrical Rough-In7/13/20157/13/20157/13/2015PPASS
DetailsRex Boyles
Contact Frank Yantis for undergfround roughin. Phone #: ###-#### Inspection requested via web by Tom Betty r/i u.ground (FOAM) continuation from southwest elevator, south of helix only , west to stiarwell. ok to cover.
Final7/2/20157/9/20157/9/2015APART
DetailsRex Boyles
Contact Brandon Robinson for room by room final inspections starting on level 3. Phone #: ###-#### Inspection requested via web by Tom Betty final ok on level3 helix and garden studio including electrical rooms, center of helix large room
Final7/2/20157/8/20157/8/2015APART
DetailsRex Boyles
Contact Brandon Robinson for room by room final inspections starting on level 2. Phone #: ###-#### Inspection requested via web by Tom Betty 1st floor helix area partial final ok except kitchen island. 2nd floor helix area partial final ok except conference room sound wall. Checked listings on all light fixtures in these areas also ok. 2nd floor electrical/chiller room final ok
Final7/2/20157/7/20157/7/2015AFAIL
DetailsRex Boyles
Contact Brandon Robinson for room by room final inspections starting on level 1. Phone #: ###-#### Inspection requested via web by Tom Betty 422.31 and 422.32-disconnect and lockoff required for hand dryers, 210.8(B)-GFCI protection required in other than dwellings kitchens for all 125 volt 20amp receptacles, 422.52-all drinking fountains shall have GFCI protection. 406.8(B)-all receptacles in wet locations shall be listed "weather resistant" type. Please have listings for lumiaires available for inspections.
Electrical Rough-In7/1/20157/2/20157/2/2015APASS
DetailsRex Boyles
Contact Frank Yantis for grade level underground raceway inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i slab on deck 1st flr south of helix west up to elevator column line ok to cover
Electrical Rough-In6/19/20156/22/20156/22/2015APASS
DetailsRex Boyles
Under Slab inspection for JUMP Site work- Contact Frank Yantis for access. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok slab on grade in parking garage (foam) conduits ok to cover from col.line 9.8 to the east
Electrical Rough-In6/2/20156/4/20156/4/2015PPASS
DetailsRex Boyles
Contact Brandon Robinson for east side of level 1 site lighting underground. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok marketplace area A and H underground conduits under foam.
Conference5/27/20155/27/20155/27/2015PDONE
DetailsRex Boyles
Please come to the JUMP trailer to contact Tony Keen about the fire pump controller. Phone #: ###-#### Inspection requested via web by Tom Betty discuss fire pump controller for helx part of bldg. OK to use 400amp rated controller as per meeting with Jeff and Tony
Electrical Rough-In5/20/20155/22/20155/26/2015PPASS
DetailsRex Boyles
Contact Brandon Robinson for level 6 kitchen ceiling inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ceiling ok
Electrical Rough-In5/14/20155/15/20155/15/2015PPASS
DetailsRex Boyles
Contact Dennis Kienitz for above ceiling rough in for level 2. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok 2nd flr offices and breakroom ceilings, 3rd flr passenger elevator ceiling, 5th flr west fun zone underslab conduits and 1st flr east side "area1" underslab conduits ok
Electrical Rough-In5/15/20155/15/20155/15/2015ANR
DetailsDaryl DeGrange
Contact Brandon Robinson for level 5 in slab rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Not ready at this time.
Electrical Rough-In5/12/20155/13/20155/13/2015APASS
DetailsRex Boyles
Call Brandon Robinson for level 6 ceiling rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok ballroom ceiling 6th flr
Conference5/12/20155/12/20155/12/2015PDONE
DetailsDaryl DeGrange
Contact Toby Davis for conference on light fixture modification. Phone #: ###-#### Inspection requested via web by Tom Betty Discussed with contractor ok relocate junction boxes for LED luminaires
Conference5/5/20155/6/20155/6/2015ADONE
DetailsDaryl DeGrange
Contact Tony Keen in job trailer for Fire Pump Controller consultation. Phone #: ###-#### Inspection requested via web by Tom Betty Discussed fire pump controller provides short circuit protection only as per 695.5(C)(2) requirement. Waiting for Eaton`s electrical engineer (Rick Dottson) to sign off that MCP will operate indefinitely under locked rotor conditions.
Electrical Rough-In4/29/20154/29/20154/29/2015PPASS
DetailsDaryl DeGrange
Call Jon Novak for level 1 rough in. Phone #: ###-#### Inspection requested via web by Tom Betty rough-in ok cover Multi-media rooms ceiling grid
Electrical Rough-In4/27/20154/28/20154/28/2015APASS
DetailsDaryl DeGrange
Contact Brandon Robinson for level 6 north stairtower AO1& soffit rough in. Phone #: ###-#### Inspection requested via web by Tom Betty rough-in ok cover
Electrical Rough-In4/23/20154/24/20154/24/2015APASS
DetailsRex Boyles
Contact Jon Novak for grade level underground installation. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok under slab power and telco conduits 1st floor east end
Electrical Rough-In4/21/20154/22/20154/22/2015APASS
DetailsRex Boyles
Contact Brandon Robinson for level 5 rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i party deck "PT deck" conduits ok to cover.
Conference4/9/20154/10/20154/10/2015ADONE
DetailsRex Boyles
Contact Tony Keen for conference about Fire Pump Controller sizing. Phone #: ###-#### Inspection requested via web by Tom Betty discuss fire pump controller size "400 amp" being to small for locked rotor @ 908 amps. Will get back to them with an answer asap!
Electrical Rough-In4/8/20154/8/20154/8/2015PPASS
DetailsRex Boyles
Brandon Phone #: ###-#### r/i ok level3 west tractor box walls and ceiling
Electrical Rough-In3/19/20153/20/20153/20/2015APASS
DetailsRex Boyles
Contact Brandon Robinson for 4th level east side rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i 4th level est side tractor box ceiling and walls ok
Final3/2/20153/3/20153/3/2015PCANC
DetailsRex Boyles
Contact Brandon Robinson for levels 3,4,and 5 rough in Phone #: ###-#### Inspection requested via web by Tom Betty needed r/i insp.
Electrical Rough-In3/3/20153/3/20153/3/2015PPASS
DetailsRex Boyles
Contact Brandon Robinson for levels 3,4,and 5 rough in Phone #: ###-#### Inspection requested via web by Tom Betty R/I ceiings ok tractor boxes on level 2,3 and 4. Service elevator lobby ceilings on level 3, 4, 5 and 6 r/i ok
Electrical Rough-In3/2/20153/2/20153/2/2015PCANC
DetailsRex Boyles
Contact Brandon Robinson for levels 3.4 and 5 roughin. Phone #: ###-#### >> Inspection requested via web by Tom Betty Inspection cancelled from web by: Tom Betty
Conference2/24/20152/25/20152/25/2015ADONE
DetailsRex Boyles
Contact Toby Davis question on mounting busway sideways on level 6. Phone #: ###-#### Inspection requested via web by Tom Betty discuss receptacles facing up in light box for "Jump room" theatrical room. Ok to face up with "in use covers only".
Electrical Rough-In2/11/20152/12/20152/12/2015APASS
DetailsRex Boyles
Cantact Brandon Robinson for level 4 ceiling inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok level 4 elevator lobby ceiling
Electrical Rough-In2/9/20152/10/20152/10/2015PPASS
DetailsRex Boyles
Contact Brondon Robinson for upper level ceiling inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok level 5 ceilings in movement and multi media. Also level 6 overflow lobby ceilings ok
Electrical Rough-In1/29/20151/30/20151/30/2015APASS
DetailsRex Boyles
Contact Brandon Robinson for level 6 ceiling rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok partial ceiling level 6 corridor 06-A21 and breezeway
Electrical Rough-In1/26/20151/27/20151/27/2015APASS
DetailsRex Boyles
Contact Brandon Robinson for level 5 rough in. Phone #: ###-#### Inspection requested via web by Tom Betty level5 vestibule and alcove ceilings r/i ok. Level 6 east bathrooms ceilings r/i ok
Electrical Rough-In1/21/20151/22/20151/22/2015APASS
DetailsRex Boyles
Call Brandon for level 5 rough in Phone #: ###-#### Inspection requested via web by Tom Betty r/i ceiling ok movement corridor. Also discuss lighting control panel ok not to bring nuetrals into control panel with Toby. Also discuss conduits in front of transformer "not in the way of working space" and is ok with Dennis.
Electrical Rough-In12/16/201412/17/201412/17/2014PPASS
DetailsRex Boyles
Contact Brandon Robinson for level 5 rough in inspection. Phone #: ###-#### Inspection requested via web by Tom Betty movement studio bathrooms and electrical room ceilings r/i ok
Electrical Rough-In12/10/201412/11/201412/11/2014APASS
DetailsRex Boyles
Call Brandon Robinson for level 5 ceiling rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok level 5 soffits and level 4 electrical room ok to energize sw. gear
Electrical Rough-In12/5/201412/8/201412/8/2014PPASS
DetailsRex Boyles
Cieling inspection level 1 contact Dennis Kienitz Phone #: ###-#### Inspection requested via web by Tom Betty kitchen and hall ceiling r/i ok
Electrical Rough-In11/21/201411/21/201411/21/2014PPASS
DetailsRex Boyles
Tony Phone #: ###-#### r/i level 6 kitchen corridor walls and storage rooms ok
Final11/6/201411/7/201411/7/2014PPASS
DetailsRex Boyles
Contact Brandon Robinson for level 6 kitchen rough in cover inspection. Phone #: ###-#### Inspection requested via web by Tom Betty r/i walls partial level 6
Electrical Rough-In11/3/201411/4/201411/4/2014PPASS
DetailsRex Boyles
Level 4 ceiling rough in. Contact Brandon Robinson. Phone #: ###-#### Inspection requested via web by Tom Betty level 4 remainder of ceiling r/i except elevator lobby ok to cover
Electrical Rough-In10/31/201410/31/201410/31/2014APASS
DetailsRex Boyles
Level 1 kitchen ceiling rough in. Call Dennis Kienitz for walk through. Phone #: ###-#### Inspection requested via web by Tom Betty level 1 kitchen studio ceiling
Electrical Rough-In10/29/201410/30/201410/30/2014APASS
DetailsRex Boyles
Jon Mittlieder needs restroom walls on level 6 inspected. Phone #: ###-#### Inspection requested via web by Tom Betty r/i bath walls level 6 ok. r/i ceiling level 4 elevator area ok
Electrical Rough-In10/20/201410/21/201410/21/2014PPART
DetailsRex Boyles
4th level soffit area rough in. Phone #: ###-#### Inspection requested via web by Tom Betty level 4 soffits and ceiling r/i ok see inspector set for exact areas
Electrical Rough-In10/20/201410/21/201410/21/2014APART
DetailsRex Boyles
Level 5 rough in for Brandon. Phone #: ###-#### Inspection requested via web by Tom Betty level 5 helix- r/i soffits and walls ok level 6 helix- columns and u. ground between columns only r/i ok see inspector set
Permanent Service10/17/201410/17/201410/17/2014PPASS
DetailsRex Boyles
Please come to Lea Electric job trailer for breaker testing documentation. Phone #: ###-#### Inspection requested via web by Tom Betty p/s u/g n ok received performance test docs from switchgear manufacturer for gear as per 230.95 (C)
Permanent Service10/15/201410/15/201410/15/2014AFAIL
DetailsRex Boyles
Call Jon. This inspection is in conjunction with inspection for permit ELE12-02982. Phone #: ###-#### Inspection requested via web by Tom Betty performance testing documents needed prior to energizing as per 230.95C
Electrical Rough-In10/7/201410/8/201410/8/2014APASS
DetailsRex Boyles
Level 5 soffit rough in. Phone #: ###-#### Inspection requested via web by Tom Betty level 1 stairwell lobby ceiling, level 3 stairwell service core soffit and level 5 soffit and multi purpose walls ok to cover
Electrical Rough-In9/29/20149/29/20149/29/2014PPASS
DetailsRex Boyles
Level 3 Phone #: ###-#### Inspection requested via web by Tom Betty partial ceiling 3rd level
Electrical Rough-In9/22/20149/22/20149/22/2014PPASS
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok ceiling below movement studio
Electrical Rough-In9/18/20149/19/20149/19/2014PPASS
DetailsRex Boyles
Call Brandon for level 4 in soffit rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ceiling under inspiration studio ok to cover
Electrical Rough-In9/17/20149/17/20149/17/2014PPASS
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Tom Betty go over fat grid ceiling submittals to confirm installation is acceptable. Additional supports have been installed onthese ceilings. r/i ok part of 3rd level ceiling helix
Electrical Rough-In9/15/20149/15/20149/15/2014PPASS
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Tom Betty level 5 motion studio and bathroom walls and all helix columns and walls r/i ok
Electrical Rough-In9/5/20149/8/20149/8/2014APASS
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Tom Betty level 2 ceiling partial r/i ok
Electrical Rough-In9/5/20149/5/20149/5/2014PPASS
DetailsRex Boyles
Level 2 soffit Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok soffit level 2
Electrical Rough-In8/20/20148/21/20148/21/2014PPASS
DetailsRex Boyles
Level four restroom area. Talk to Brandon. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok 1st floor bath ceilings, 3rd floor walls in electrical rooms, 4th floor bathroom walls
Electrical Rough-In8/7/20148/7/20148/7/2014PPASS
DetailsRex Boyles
Level 1 Lobby Phone #: ###-#### Inspection requested via web by Tom Betty r/i ceiling ok waiting area A 015
Electrical Rough-In7/21/20147/22/20147/22/2014PPASS
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok slab level garden studio , middle section
Electrical Rough-In6/25/20146/25/20146/25/2014APASS
DetailsRex Boyles
2nd level rough in Phone #: ###-#### >> Inspection requested via web by Tom Betty rough in ok level 2 area A kitchen lobby walls
Electrical Rough-In6/23/20146/24/20146/24/2014PPASS
DetailsRex Boyles
Phone #: ###-#### >> Inspection requested via web by Tom Betty rough in ok remainder of exterior walls in multimedia 4 th floor not including pony wall
Electrical Rough-In6/19/20146/20/20146/20/2014PPASS
DetailsRex Boyles
Phone #: ###-#### >> Inspection requested via web by Tom Betty rough in ok -Level 1-lobby walls, level 3-maint. room walls, level4-multi media studio walls, inspiration studio walls, (level 5 makers studio walls see Arch. sheet A3-05-B)
Electrical Rough-In6/10/20146/11/20146/11/2014APASS
DetailsRex Boyles
Phone #: ###-#### >> Inspection requested via web by Tom Betty rough in ok kitchen studio and trash compactor/mechanical riser room
Final6/5/20146/6/20146/6/2014PCANC
DetailsRock A. Hudson
Same site as inspection for ELE-011385 same time period. Phone #: ###-#### >> Inspection requested via web by Tom Betty Foreman to check on this request and recall if needed
Electrical Rough-In5/30/20146/2/20146/2/2014PPASS
DetailsRex Boyles
Any questions please call Jon Novak. Phone #: ###-#### >> Inspection requested via web by Vicki Moore rough in walls ok in bathrooms O1A-21 thru 24, and rooms 1A -31 thru 35
Final1/21/20141/22/20141/22/2014PCANC
DetailsRock A. Hudson
Please contact Rob Crook for access Phone #: ###-#### >> Inspection requested via web by Tina Payne Needed inspection at 5310 w. state. Wrong permit requested
Conference1/21/20141/21/20141/21/2014PDONE
DetailsRock A. Hudson
Contract Tony Keen at ###-####. Phone #: ###-#### >> Inspection requested via web by Tina Payne Discussed conduits and boxes installed in precast parking barriers. Contractor to verify 3rd party listing on company making barriers. APA Certified company listed on spec sheet for barriers
Final1/15/20141/15/20141/15/2014PPASS
DetailsRock A. Hudson
lea electric Phone #: ###-#### 5th floor "jump" floor pour rough in ok cover
Electrical Rough-In12/19/201312/20/201312/20/2013APASS
DetailsRock A. Hudson
John Phone #: ###-#### Heat tape located in super columns rough in ok cover
Electrical Rough-In11/22/201311/25/201311/25/2013PPASS
DetailsRock A. Hudson
Level 5 deck next to Myrtle. Phone #: ###-#### >> Inspection requested via web by Tony Keen 5 th floor second pour as noted on print rough in ok cover
Electrical Rough-In11/20/201311/21/201311/21/2013APASS
DetailsRock A. Hudson
Level 1 North side of Helix Phone #: ###-#### >> Inspection requested via web by Tony Keen Buil up level 1 floor pour as noted on print rough in ok cover
Electrical Rough-In10/30/201310/31/201310/31/2013APASS
DetailsRock A. Hudson
Level 4 south of helix Phone #: ###-#### >> Inspection requested via web by Tony Keen
4th floor ramp pour rough in ok cover
Electrical Rough-In10/23/201310/24/201310/24/2013PPASS
DetailsRock A. Hudson
Level 5 PT deck. Top of the stair tower. Phone #: ###-#### >> Inspection requested via web by Tony Keen As noted on print 5th floor pour rough in ok cover
Electrical Rough-In10/14/201310/15/201310/15/2013APART
DetailsDoug A Poedy
Rough in of ramp Phone #: ###-#### >> Inspection requested via web by Tony Keen. Ramp between 2nd and 3rd floor ok to cover.
Electrical Rough-In10/3/201310/4/201310/4/2013APASS
DetailsRock A. Hudson
Phone #: ###-#### >> Inspection requested via web by Tony Keen Ramp pour as noted on print rough in ok cover
Electrical Rough-In9/24/20139/25/20139/25/2013APASS
DetailsRock A. Hudson
Phone #: ###-#### >> Inspection requested via web by Tony Keen Ramp pour as noted on print rough in ok cover
Electrical Rough-In9/20/20139/23/20139/23/2013APASS
DetailsRock A. Hudson
Phone #: ###-#### >> Inspection requested via web by Tony Keen 4th floor helix pour as noted on print. Rough in ok cover
Electrical Rough-In9/17/20139/18/20139/18/2013PPASS
DetailsRock A. Hudson
Level 4 parking garage rough in Phone #: ###-#### >> Inspection requested via web by Tony Keen 4th floor pour as noted on print rough in ok cover
Electrical Rough-In9/11/20139/11/20139/11/2013PPASS
DetailsRock A. Hudson
John Phone #: ###-#### Parking garage basement air handling extrusion pour as noted on print rough in ok cover
Electrical Rough-In9/6/20139/9/20139/9/2013APASS
DetailsRock A. Hudson
john Phone #: ###-#### Ramp pour in as noted on print. Rough in ok cover
Electrical Rough-In8/27/20138/28/20138/28/2013PPASS
DetailsRock A. Hudson
john Phone #: ###-#### 4th floor parking garage pour as noted on print. Rough in ok cover
Electrical Rough-In8/22/20138/22/20138/22/2013PPASS
DetailsRock A. Hudson
john Phone #: ###-#### Helix 3rd floor pour rough in ok cover
Electrical Rough-In8/9/20138/12/20138/12/2013APASS
DetailsRock A. Hudson
john Phone #: ###-#### Ramp as noted on print pour rough in ok cover
Electrical Rough-In7/25/20137/26/20137/26/2013APASS
DetailsRock A. Hudson
john Phone #: ###-#### Helix 2nd floor pour as noted on print. Rough in ok cover
Electrical Rough-In7/18/20137/19/20137/18/2013APASS
DetailsRock A. Hudson
tony Phone #: ###-#### Outer ramp floor 1 to 2 rough in ok cover
Electrical Rough-In7/16/20137/17/20137/17/2013PPASS
DetailsRock A. Hudson
John Phone #: ###-#### 3rd floor pour as noted on print rough in ok cover