Final | 7/11/2013 | 7/11/2013 | 7/11/2013 | P | PASS |
Rock A. Hudson
|
|
|
Strapping, and circuits are all on. GFCI repaired. Phone #: ###-#### >> Inspection requested via web by Steve Craig Final ok
|
Final | 7/11/2013 | 7/11/2013 | 7/11/2013 | A | FAIL |
Rock A. Hudson
|
|
|
Remodel of bathrooms and addition of power poles Phone #: ###-#### >> Inspection requested via web by Steve Craig Bath GFCI in-op unable to test. Sone power poles in-op unable to test. MC cable shall be supported with in 12" of fitting.
|
Final | 5/23/2013 | 5/24/2013 | 5/24/2013 | A | PART |
Doug A Poedy
|
|
|
Cover inspection for new wall in bathrooms. Phone #: ###-#### >> Inspection requested via web by Steve Craig. Ok to cover bathroom walls. Needs to replace burnt section of smurf in ceiling.
|