Final | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | PASS |
Rock A. Hudson
|
|
|
Boise HS should be unlocked so inspector can get in and do the final inspection. If there is a problem getting in please call the contractor, Shawn Gafford at ###-####. Phone #: ###-#### >> Inspection requested via web by Judy Spencer Final ok
|
Electrical Rough-In | 6/13/2013 | 6/14/2013 | 6/14/2013 | A | PASS |
Rock A. Hudson
|
|
|
Warren-wall r/i and t ceiling grid inspection please Tech building room 224 Phone #: ###-#### Buiding 916 on corner, wall and ceiling rough in ok cover
|