Final | 7/10/2013 | 7/10/2013 | 7/10/2013 | P | PASS |
Rock A. Hudson
|
|
|
Please call Asher Sears if any questions Phone #: ###-#### >> Inspection requested via web by brad williams Final ok
|
Final | 7/8/2013 | 7/8/2013 | 7/8/2013 | P | NR |
Rock A. Hudson
|
|
|
Please call Asher Sears if any questions Phone #: ###-#### >> Inspection requested via web by brad williams Devices changed, split unit has not been corrected yet.
|
Final | 7/2/2013 | 7/3/2013 | 7/3/2013 | A | FAIL |
Rock A. Hudson
|
|
|
Please call Asher Sears if any questions Phone #: ###-#### >> Inspection requested via web by brad williams 400.8 Split system, flexible cord shall not pass through wall. 406.11 In all areas listed in 210.52 all 15 and 20 amp120 volt recepticals shall be tamper resistant.
|
Electrical Rough-In | 6/14/2013 | 6/14/2013 | 6/14/2013 | P | PASS |
Rock A. Hudson
|
|
|
Asher Phone #: ###-#### Garage rough in ok cover
|
Electrical Rough-In | 6/12/2013 | 6/13/2013 | 6/13/2013 | A | FAIL |
Rock A. Hudson
|
|
|
Please call Asher Sears, the electrician, if any questions Phone #: ###-#### >> Inspection requested via web by brad williams 300.4- NMB cable shall be secured at least 1 1/4" from framing member edge. 334.30 Flat cables shall not be sedured on edge. HVAC classifies 18" above floor in garage as hazardous location, move recepticals up to 18" minimum to bottom.
|