Final | 6/19/2013 | 6/19/2013 | 6/19/2013 | A | PASS |
Daryl DeGrange
|
|
|
job complete final ok
|
Electrical Rough-In | 6/18/2013 | 6/19/2013 | 6/19/2013 | A | PASS |
Daryl DeGrange
|
|
|
robert Phone #: ###-#### correction completed rough-in ok
|
Final | 6/14/2013 | 6/17/2013 | 6/17/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Robert Phone #: ###-#### NEC 400.8 (1)&(2) Flexible cords and cables shall not be substituted for fixture wiring of a structure
|