Final | 9/27/2013 | 9/27/2013 | 9/27/2013 | P | PASS |
Daryl DeGrange
|
|
|
Kitchen is complete and ready for final inspection. Call Kurt Carlson when you are able to walk through job, I will meet you there and have an escort available. It would be best 3:30 to 4:30 Phone #: ###-#### >> Inspection requested via web by Kurt Carlson job complete, final ok
|
Electrical Rough-In | 8/20/2013 | 8/20/2013 | 8/20/2013 | P | PASS |
Daryl DeGrange
|
|
|
rough-in ok cover kitchen ceiling grid
|
Conference | 8/19/2013 | 8/20/2013 | 8/20/2013 | A | PASS |
Daryl DeGrange
|
|
|
Need to look at existing conduit and low voltage systems, make sure they are to code. >> Inspection requested via web by Kurt Carlson Discussed requirements for exsisting electrical wiring above ceiling grid. Bring all exposed electrical installations up to code.
|
Final | 7/16/2013 | 7/17/2013 | 7/17/2013 | P | PART |
Daryl DeGrange
|
|
|
This is a partial final for the new dry storage area. Owners want to move product into the new area. Phone #: ###-#### >> Inspection requested via web by Kurt Carlson Partial final for new Dry storage and ok cover ceiling, public visting area
|
Electrical Rough-In | 7/1/2013 | 7/2/2013 | 7/2/2013 | A | PASS |
Daryl DeGrange
|
|
|
Need rough in inspection of the new dry storage area. Call Kurt, ###-####, 1st thing in morning, let me know time, I will meet you at back post area, where cars are parked and walk you through. Phone #: ###-#### >> Inspection requested via web by Kurt Carlson rough-in ok cover
|
Electrical Rough-In | 6/27/2013 | 6/27/2013 | 6/27/2013 | P | CANC |
Daryl DeGrange
|
|
|
Need rough in inspection of new dry storage area. Lighting, power, fire alarm , security cameras, data, conduit and wire pulling complete. Call Kurt Carlson ###-#### I will meet inspector and walk into facility. Phone #: ###-#### >> Inspection requested via web by Kurt Carlson //cancelled per Kurt 6/27/13 @ 10:37, will call back to reschedule..leg
|