Final | 8/28/2013 | 8/29/2013 | 8/29/2013 | A | PASS |
Rock A. Hudson
|
|
|
please call ahead for access - Stacy Phone #: ###-#### Final ok
|
Electrical Rough-In | 7/9/2013 | 7/10/2013 | 7/10/2013 | A | PASS |
Rock A. Hudson
|
|
|
Before 10:30 please - Tyler Phone #: ###-#### Basement rough in ok cover
|
Electrical Rough-In | 7/8/2013 | 7/9/2013 | 7/9/2013 | A | FAIL |
Rock A. Hudson
|
|
|
Tyler-Prior to 10:30 PLease Phone #: ###-#### 12-3 needed between smoke detectors. Secure NM cable with in 12" of boxes. Mud ring needed for j-box in ceiling
|
Electrical Rough-In | 7/5/2013 | 7/8/2013 | 7/8/2013 | A | CANC |
Rock A. Hudson
|
|
|
Tyler Phone #: ###-####
|
Final | 7/5/2013 | 7/5/2013 | 7/5/2013 | P | CANC |
Rock A. Hudson
|
|
|
Tyler-Late pm please Phone #: ###-#### //cancelled per Tyler, called inspector -- leg
|
Conference | 7/2/2013 | 7/2/2013 | 7/2/2013 | P | DONE |
Rock A. Hudson
|
|
|
Early as Possible//Tyler Phone #: ###-#### Discussed code required general purpose recepticals, dedicated bath and laundry circuits, and location of bath recepticals
|