Final | 2/10/2014 | 2/10/2014 | 2/10/2014 | P | PASS |
Doug A Poedy
|
|
|
|
ELE-Aging Inspection | 1/7/2014 | 1/7/2014 | 1/7/2014 | A | DONE |
Bob Reichert
|
|
|
301 pending final. let me know when signed off if you would. called, left message to call for final
|
Final | 11/1/2013 | 11/4/2013 | 11/4/2013 | A | PART |
Bob Reichert
|
|
|
CJ is contact. Thanks Phone #: ###-#### >> Inspection requested via web by Chris Chesnut check 3 gfci main bar, panel clearances, listings for cooler, not just door, signed t/o card
|
Electrical Rough-In | 10/29/2013 | 10/30/2013 | 10/30/2013 | A | PASS |
Bob Reichert
|
|
|
Partial. Grid Inspection (kitchen area). CJ is contact. Thank you Phone #: ###-#### >> Inspection requested via web by Chris Chesnut ok cover dropped ceiling only
|
Electrical Rough-In | 8/20/2013 | 8/21/2013 | 8/21/2013 | P | PASS |
Bob Reichert
|
|
|
Cj is contact. Thanks! Phone #: ###-#### >> Inspection requested via web by Chris Chesnut walls and hard lids only ok cover
|
Electrical Rough-In | 7/8/2013 | 7/9/2013 | 7/9/2013 | A | PASS |
Bob Reichert
|
|
|
underground inspection. re inspect. Please call before going. Thanks Phone #: ###-#### >> Inspection requested via web by Chris Chesnut ok cover u/g 2 conduits, west end only, called contractor
|
Electrical Rough-In | 7/8/2013 | 7/8/2013 | 7/8/2013 | P | FAIL |
Bob Reichert
|
|
|
underground only called, left message, left card, BCC shall not cover electrical until inspected, fee due
|