Final | 8/12/2013 | 8/13/2013 | 8/13/2013 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jeff Gooch ok final, no card to sign
|
Permanent Service | 7/16/2013 | 7/16/2013 | 7/16/2013 | P | PASS |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jeff Gooch. P/S Connect ok.
|
Permanent Service | 7/15/2013 | 7/15/2013 | 7/15/2013 | P | FAIL |
Daryl DeGrange
|
|
|
Call Jeff Gooch (Electric Shop Foreman) at ###-#### if you want him on site for the inspection. Thanks, have a good day! Phone #: ###-#### >> Inspection requested via web by Jeff Gooch NEC 250.56 permanent service requires two ground rods unless first ground rod has less than 25 ohms of resistance to ground, highest location a breaker can be installed in a service panel 6'7"
|