Final | 9/11/2013 | 9/12/2013 | 9/12/2013 | A | PASS |
Daryl DeGrange
|
|
|
Call Steve at ###-#### for access 30 minutes prior. Phone #: ###-#### >> Inspection requested via web by Steve Craig final ok
|
Final | 9/10/2013 | 9/11/2013 | 9/11/2013 | P | NH |
Daryl DeGrange
|
|
|
Call Dan at ###-#### to arrange access. Phone #: ###-#### >> Inspection requested via web by Steve Craig No access
|
Electrical Rough-In | 8/5/2013 | 8/6/2013 | 8/6/2013 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling cover inspection Phone #: ###-#### >> Inspection requested via web by Steve Craig rough-in ok cover
|
Electrical Rough-In | 8/5/2013 | 8/5/2013 | 8/5/2013 | A | NR |
Daryl DeGrange
|
|
|
Ceiling inspection for cover Phone #: ###-#### >> Inspection requested via web by Steve Craig not ready
|
Electrical Rough-In | 7/16/2013 | 7/17/2013 | 7/17/2013 | A | PASS |
Daryl DeGrange
|
|
|
Roughin of new walls in existing space. Phone #: ###-#### >> Inspection requested via web by Steve Craig rough-in ok cover walls
|