Final | 8/29/2013 | 8/30/2013 | 8/30/2013 | A | PASS |
Daryl DeGrange
|
|
|
Guy on site. Phone #: ###-#### >> Inspection requested via web by Clint Tate final ok no card on site
|
Electrical Rough-In | 8/21/2013 | 8/22/2013 | 8/22/2013 | P | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection for Building 8 @ HP. Journeyman on-site is Guy Thomas ###-#### Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover ceiling grid
|
Electrical Rough-In | 8/15/2013 | 8/16/2013 | 8/16/2013 | P | PASS |
Daryl DeGrange
|
|
|
Hewlett Packard Building 8 ceiling inspection. Journeyman electrician on-site is Guy Thomas ###-#### Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover ceilng grid in 14 training rooms
|
Rough-In Permanent Service | 7/19/2013 | 7/22/2013 | 7/22/2013 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Tate corrections done, rough-in ok cover walls
|
Electrical Rough-In | 7/18/2013 | 7/19/2013 | 7/19/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Tate NEC 330.30 MC cable shall be secured within 12 in. NEC 362.26 shall not be more than 360 degrees between pull points NEC 362.30 ENT Securely fastened. KO plugs where needed
|