Final | 9/26/2014 | 9/26/2014 | 9/26/2014 | A | PASS |
Rex Boyles
|
|
|
final for light poles in parking lot final ok on light poles with PV erray panels
|
Final | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | PASS |
Rex Boyles
|
|
|
Robert. 1st floor final. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy final ok corrections made
|
Final | 7/3/2014 | 7/3/2014 | 7/3/2014 | P | PART |
Rex Boyles
|
|
|
Robert. 1st floor. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy oasis and mail gfi needed
|
Electrical Rough-In | 7/1/2014 | 7/2/2014 | 7/2/2014 | A | PASS |
Rex Boyles
|
|
|
Levi. 2nd floor corridor ceiling cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ceilings ok to cover in corridor
|
Electrical Rough-In | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | PASS |
Rex Boyles
|
|
|
Ticket booth underground. Robert is the on-site contact. Phone #: ###-#### >> Inspection requested via web by Buster Bowen r/i u.g. ok
|
Permanent Service | 6/26/2014 | 6/27/2014 | 6/27/2014 | A | PASS |
Rex Boyles
|
|
|
Robert or Levi on site contact. If possible please come later in the morning. Phone #: ###-#### >> Inspection requested via web by Buster Bowen p/s u/g rec ok
|
Electrical Rough-In | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | PASS |
Rex Boyles
|
|
|
Robert. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough in ceiling ok to cover west stairwell#214 and corridor #208
|
Electrical Rough-In | 6/24/2014 | 6/24/2014 | 6/24/2014 | P | PASS |
Rex Boyles
|
|
|
Rough-in cover for electrical feeders. Dan L on site Phone #: ###-#### >> Inspection requested via web by Buster Bowen conference for new main disconnect
|
Electrical Rough-In | 6/20/2014 | 6/20/2014 | 6/20/2014 | P | PASS |
Rex Boyles
|
|
|
Robert. Boardroom can light cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough in ceiling ok
|
Conference | 6/17/2014 | 6/18/2014 | 6/18/2014 | P | DONE |
Rex Boyles
|
|
|
Levi. Service Switch. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy discuss new main disconnect and feeders
|
Permanent Service | 6/13/2014 | 6/13/2014 | 6/13/2014 | P | PASS |
Rex Boyles
|
|
|
Levi. 400A permanent service. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy p/s u/g n ok
|
Final | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PART |
Rex Boyles
|
|
|
Levi. Apartments 2nd & 3rd floors. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 2nd floor and 3rd floor final ok
|
Conference | 5/16/2014 | 5/20/2014 | 5/20/2014 | A | DONE |
Rex Boyles
|
|
|
Robert. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy discuss showwindow receptacle required by code. Historical Society does'nt want them at all. ??
|
Electrical Rough-In | 5/12/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Rex Boyles
|
|
|
Levi. Site underground inspection. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy underground to light poles in parking lot
|
Electrical Rough-In | 5/12/2014 | 5/13/2014 | 5/13/2014 | A | PASS |
Rex Boyles
|
|
|
Robert 1st floor restroom. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough in ok to cover walls and ceilings
|
Electrical Rough-In | 5/6/2014 | 5/7/2014 | 5/7/2014 | A | PASS |
Rock A. Hudson
|
|
|
Robert. 1st floor high ceiling. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 2nd floor cans as noted on print and 6th floor CCD11 hard lid rough in ok cover
|
Electrical Rough-In | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PASS |
Rex Boyles
|
|
|
Robert. 2nd floor bathroom cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough in ok 2nd floor bathrooms , bridal store walls and ceilings, and corridor south side wall. !st floor breezeway entrance and corridor to the south ceilings
|
Electrical Rough-In | 4/22/2014 | 4/23/2014 | 4/23/2014 | A | PASS |
Rex Boyles
|
|
|
Ceiling Cover Phone #: ###-#### >> Inspection requested via web by Buster Bowen rough in ok to cover first floor ceiling
|
Electrical Rough-In | 4/15/2014 | 4/17/2014 | 4/17/2014 | A | PASS |
Rex Boyles
|
|
|
Robert. 1st Floor Ceiling cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough in ok to cover 1st floor stairwell ceiling and east wall
|
Electrical Rough-In | 4/11/2014 | 4/14/2014 | 4/14/2014 | P | PASS |
Rex Boyles
|
|
|
Robert. Wall cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 6th floor staging room walls rough in ok to cover
|
Electrical Rough-In | 4/10/2014 | 4/10/2014 | 4/10/2014 | P | PASS |
Rex Boyles
|
|
|
Robert. 3rd floor wall cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 3rd floor corridor walls rough in ok
|
Electrical Rough-In | 3/31/2014 | 4/1/2014 | 4/1/2014 | A | PASS |
Rock A. Hudson
|
|
|
1st floor restrooms. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 1st floor bathroom walls and hard lid, 1st floor lighting test panel ceiling, 1st floor bar walls and hard lid, 1st floor wall north of bar corridor rough in ok cover
|
Conference | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | DONE |
Rex Boyles
|
|
|
Levi. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy discuss abandoning broken 3000 amp disconnect and moving load to 2000 amp side. needs re-engineering to calculate exact load first.
|
Permanent Service | 3/14/2014 | 3/17/2014 | 3/17/2014 | A | PASS |
Daryl DeGrange
|
|
|
Service for fire pump and millbank ped. Phone #: ###-#### >> Inspection requested via web by Buster Bowen p/s u/g n ok
|
Electrical Rough-In | 3/14/2014 | 3/17/2014 | 3/17/2014 | A | PASS |
Daryl DeGrange
|
|
|
1st Floor wall cover Phone #: ###-#### >> Inspection requested via web by Buster Bowen Rough-in ok cover 10x10 hard lid ceiling mock-up as highlighted on plans. No walls with this inspection
|
Electrical Rough-In | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | PASS |
Rock A. Hudson
|
|
|
Robert. 3rd floor restroom rough-in. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 1st floor apartment lobby walls and hard lid access panels will be needed for existing junction boxes and disconnects, 3rd floor bathrooms wall and hard lid rough in ok
|
Electrical Rough-In | 2/24/2014 | 2/24/2014 | 2/25/2014 | P | PASS |
Rex Boyles
|
|
|
3rd and 4th floor ceiling. Robert on site. Phone #: ###-#### >> Inspection requested via web by Buster Bowen ceilings on 3rd and fourth floor elevator lobbys ok to cover. !st floor apt. TV wall pony wall ok to cover.
|
Electrical Rough-In | 2/20/2014 | 2/20/2014 | 2/20/2014 | P | PASS |
Rock A. Hudson
|
|
|
roughin ok to cover walls in 4th and 5th floor elevator lobby and stair lobby
|
Electrical Rough-In | 2/17/2014 | 2/18/2014 | 2/18/2014 | A | PASS |
Rock A. Hudson
|
|
|
4th Floor Ceiling. Robert on site Phone #: ###-#### >> Inspection requested via web by Buster Bowen 4th and fifth floor bath lids and third floor elevator lobby ceiling and walls. R/I OK cover
|
Electrical Rough-In | 2/7/2014 | 2/10/2014 | 2/10/2014 | A | PASS |
Daryl DeGrange
|
|
|
Levi. Ceiling cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Rough-in ok cover second floor corridor, second and forth floor elevator lobbies
|
Electrical Rough-In | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | PASS |
Rock A. Hudson
|
|
|
Robert. 6th floor ceiling cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ^th floor corridor grid and elevator hardlid rough in ok cover
|
Electrical Rough-In | 2/3/2014 | 2/3/2014 | 2/3/2014 | P | PASS |
Daryl DeGrange
|
|
|
2nd Floor soffit cover. Levi on site Phone #: ###-#### >> Inspection requested via web by Buster Bowen rough-in ok
|
Electrical Rough-In | 1/29/2014 | 1/29/2014 | 1/29/2014 | P | PASS |
Rock A. Hudson
|
|
|
Robert Ceiling Cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 6th floor E. of elevator 1 corridor to north ceiling rough in ok cover GFCI for drinking fountain confirmed, Bathrooms complete.
|
Electrical Rough-In | 1/24/2014 | 1/24/2014 | 1/24/2014 | P | PASS |
Rock A. Hudson
|
|
|
3rd Floor corridor Phone #: ###-#### >> Inspection requested via web by Buster Bowen 3rd floor corridor ceiling rough in ok cover
|
Electrical Rough-In | 1/23/2014 | 1/23/2014 | 1/23/2014 | P | FAIL |
Rock A. Hudson
|
|
|
3rd Floor corridor. Levi on site Phone #: ###-#### >> Inspection requested via web by Buster Bowen Corrections not complete. 300.11- Ceiling support system supported by wires so all recessed cans and light boxes shall be supported independant of ceiling support system
|
Electrical Rough-In | 1/21/2014 | 1/22/2014 | 1/22/2014 | A | FAIL |
Rock A. Hudson
|
|
|
3rd floor corridor. Levi is on site Phone #: ###-#### >> Inspection requested via web by Buster Bowen 3rd floor ceiling assembly- 300.11(1&2)- Wiring located in cavity shall not be supported by ceiling assembly or its support system unless manufacturers instruction state other wise. Contact # disconnected
|
Electrical Rough-In | 1/8/2014 | 1/8/2014 | 1/8/2014 | P | PASS |
Rock A. Hudson
|
|
|
3rd floor Ceiling soffit cover. Levi on site Phone #: ###-#### >> Inspection requested via web by Buster Bowen All apartment ceilings rough in ok cover
|
Electrical Rough-In | 1/3/2014 | 1/3/2014 | 1/3/2014 | P | PASS |
Rock A. Hudson
|
|
|
Levi. Underground, Permanent Service & 3rd floor soffits. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Possible 36 meters p/s u/g n ok
|
Electrical Rough-In | 1/2/2014 | 1/3/2014 | 1/3/2014 | A | PASS |
Rock A. Hudson
|
|
|
4th and 5th floor bathrooms. Drive thru ceiling. Phone #: ###-#### >> Inspection requested via web by Buster Bowen Rough in as noted on print in office, 4th floor walls and hard lid, 5th floor walls, drive thru ceiling, 3rd floor kitchen and hall ceiling rough in ok cover
|
Final | 12/5/2013 | 12/5/2013 | 12/5/2013 | P | PART |
Rock A. Hudson
|
|
|
Partial Final. 7th floor. Robert on site Phone #: ###-#### >> Inspection requested via web by Buster Bowen 406.8 Outdoor recepticals shall be weather resistant type. Temp final ok
|
Electrical Rough-In | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Rock A. Hudson
|
|
|
7th floor ceiling rough in ok cover
|
Electrical Rough-In | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Rock A. Hudson
|
|
|
Levi. 4th floor soffit cover & 3rd floor feeders. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 3rd floor feeders and 4th floor bath soffits rough in ok cover
|
Electrical Rough-In | 11/27/2013 | 11/27/2013 | 11/27/2013 | P | PART |
Rock A. Hudson
|
|
|
7th floor ceiling cover. Phone #: ###-#### >> Inspection requested via web by Buster Bowen 300.11- cables shall not be supported by ceiling grid. 330.30 MC cable shall not provide support for other cables. 7th floor ceiling to remain open around stairway. Perimeter ceiling rough in ok cover
|
Electrical Rough-In | 11/21/2013 | 11/21/2013 | 11/21/2013 | P | PASS |
Rock A. Hudson
|
|
|
6th floor ceiling cover Phone #: ###-#### >> Inspection requested via web by Buster Bowen 6th floor bathroom, hall hard lid, elevator lobby. Check for access for j-box above hard lid in bath. Ceiling rough in ok cover
|
Electrical Rough-In | 11/19/2013 | 11/19/2013 | 11/20/2013 | P | PASS |
Rock A. Hudson
|
|
|
Levi. Rough in 2nd & 3rd floor corridor walls & 4th floor feeders. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Floor 2-3 cprridor walls and 4th feeders. Rough n ok cover
|
Electrical Rough-In | 11/15/2013 | 11/15/2013 | 11/15/2013 | P | PASS |
Rock A. Hudson
|
|
|
Robert. 6th floor wall cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 6th floor wall rough in ok cover
|
Electrical Rough-In | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | PASS |
Rock A. Hudson
|
|
|
Robert. 7th Bathroom & hallway ceiling cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 7th floor bar walls and lid, bath walls, elevator lobby walls and lid as noted on print. Rough in ok cover.
|
Electrical Rough-In | 11/8/2013 | 11/8/2013 | 11/8/2013 | P | PASS |
Rock A. Hudson
|
|
|
Trench back fill. Phone #: ###-#### >> Inspection requested via web by Buster Bowen Fire pump underground west and north rough in ok cover
|
Electrical Rough-In | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PASS |
Rock A. Hudson
|
|
|
Levi 2nd & 3rd cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 3rd floor room walls and 2nd floor upper lids and room wall rough in ok cover
|
Electrical Rough-In | 10/29/2013 | 10/29/2013 | 10/29/2013 | A | PASS |
Rock A. Hudson
|
|
|
3rd floor apts. Ceiling cover Phone #: ###-#### >> Inspection requested via web by Buster Bowen Hard lid, kitchen and bath upper cover. rough in ok cover
|
Electrical Rough-In | 10/21/2013 | 10/22/2013 | 10/22/2013 | P | PASS |
Rock A. Hudson
|
|
|
Levi. 3rd & 4th floor apartments. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 3rd floor hardlids, 4th floor wall and hardlids, panel walls to remain open for feeders, penthouse and bath walls rough in ok cover
|
Electrical Rough-In | 10/17/2013 | 10/18/2013 | 10/18/2013 | A | PASS |
Rock A. Hudson
|
|
|
Conduit for Fire Pump. Jim on site Phone #: ###-#### >> Inspection requested via web by Buster Bowen Underground to fire pump service rough in ok cover
|
Conference | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | DONE |
Rock A. Hudson
|
|
|
Levi on site. Phone #: ###-#### >> Inspection requested via web by Buster Bowen Discussed 2 hr fire barrier for temporary feeders feeding fire sprinkler pumps. Maybe some support and strapping issues due to asbestos presence
|
Conference | 9/23/2013 | 9/24/2013 | 9/24/2013 | P | DONE |
Rock A. Hudson
|
|
|
Please call Buster 30 min prior to arrival if possible. Thanks Phone #: ###-#### >> Inspection requested via web by Buster Bowen Contractor needs to move fire pumps protecting building. Called with concerns of temporary feeder conduits to pumps not having 2 hour fire barrier. City to require 2 hour fire barrier due to tennants still doing business in building.
|