Rough-In Permanent Service | 8/9/2013 | 8/12/2013 | 8/12/2013 | A | PASS |
Daryl DeGrange
|
|
|
benjamin Phone #: ###-#### job passed r/i and final 8/09/13 as per Doug Poedy
|
Electrical Rough-In | 8/8/2013 | 8/9/2013 | 8/9/2013 | P | CANC |
Doug A Poedy
|
|
|
benjamin Phone #: ###-####
|
Final | 8/9/2013 | 8/9/2013 | 8/9/2013 | P | PASS |
Doug A Poedy
|
|
|
benjamin Phone #: ###-####
|
Rough-In Permanent Service | 8/9/2013 | 8/9/2013 | 8/9/2013 | A | PASS |
Doug A Poedy
|
|
|
benjamin Phone #: ###-####. P/S Connect ok.
|
Conference | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | DONE |
Daryl DeGrange
|
|
|
benjamin Phone #: ###-#### Discussed with homeowner electrical requirements for service upgrade
|