ELE-Aging Inspection | 3/27/2017 | 3/27/2017 | 3/27/2017 | | PASS |
Daryl DeGrange
|
|
|
see final
|
Final | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | PASS |
Daryl DeGrange
|
|
|
job complete, final ok
|
ELE-Aging Inspection | 7/12/2016 | 7/12/2016 | 7/13/2016 | | CANC |
Eric Story
|
|
|
too busy
|
ELE-Aging Inspection | 4/1/2016 | 4/1/2016 | 4/5/2016 | | CANC |
Eric Story
|
|
|
too busy
|
Electrical Rough-In | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Cevyn Recla
|
|
|
Dean Phone #: ###-#### RI Ok to cover
|
Final | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | CANC |
Cevyn Recla
|
|
|
Dean// please call before Phone #: ###-#### This was a conference inspection, not final, discussed securing of romex at box entrances before cover
|
Electrical Rough-In | 2/19/2015 | 2/19/2015 | 2/19/2015 | P | NH |
Cevyn Recla
|
|
|
Dean Phone #: ###-####// please call before left message at phone number provided at 12:50, stopped at site at 1:05, no access
|
Conference | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | DONE |
Rock A. Hudson
|
|
|
call 15 before // Dean Phone #: ###-#### Discussed work space requirements for panel locations, GFCI protection of recepticals, egress lighting, and inspection process.
|