Final | 10/4/2013 | 10/4/2013 | 10/4/2013 | P | PASS |
Bob Reichert
|
|
|
mike Phone #: ###-#### corrections made, ok final
|
Final | 9/26/2013 | 9/27/2013 | 9/27/2013 | P | FAIL |
Rock A. Hudson
|
|
|
mike Phone #: ###-#### Dishwasher not set, Range and dryer recepticals need swapped, and kitchen and bathroom devices need covers
|
Electrical Rough-In | 8/21/2013 | 8/22/2013 | 8/22/2013 | A | PASS |
Rock A. Hudson
|
|
|
mike Phone #: ###-#### rough in ok cover
|
Electrical Rough-In | 8/21/2013 | 8/21/2013 | 8/21/2013 | A | FAIL |
Bob Reichert
|
|
|
>> Inspection requested via web by Mike Okamura corrections not made, called, will recall
|
Electrical Rough-In | 8/20/2013 | 8/20/2013 | 8/20/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike Okamura Nail plate closet wall in bed. Nail plate kitchen and hall common wall. Support MC out of stud channels. Secure alluminum flex in center of stud to maintain 1 1/4" from stud surface.
|