Final | 12/19/2013 | 12/20/2013 | 12/20/2013 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Louis Keller correction completed, final ok
|
Final | 9/3/2013 | 9/4/2013 | 9/4/2013 | P | FAIL |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by Louis Keller. All is good except the light niche j box has broken conduit.
|
Electrical Rough-In | 8/21/2013 | 8/22/2013 | 8/22/2013 | A | PASS |
Daryl DeGrange
|
|
|
potting bonding and underground Phone #: ###-#### >> Inspection requested via web by Louis Keller rough-in ok
|