Final | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Daryl DeGrange
|
|
|
Service change and wash room Phone #: ###-#### >> Inspection requested via web by shane vigil final ok
|
Final | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | NR |
Daryl DeGrange
|
|
|
Service and sub panel complete back door open. Phone #: ###-#### >> Inspection requested via web by shane vigil not ready for final at this time
|
Electrical Rough-In | 8/23/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Daryl DeGrange
|
|
|
Service and sub panel complete back door open. Phone #: ###-#### >> Inspection requested via web by shane vigil rough-in ok cover utility room
|
Rough-In Permanent Service | 8/21/2013 | 8/22/2013 | 8/22/2013 | A | PASS |
Daryl DeGrange
|
|
|
power to new service. Service ready and ID power to disconnect at 9 AM would like to make the re connect and the same time. Phone #: ###-#### >> Inspection requested via web by shane vigil p/s o/h rec ok
|