Conference | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PASS |
Mark Moncarr
|
|
|
please call Kevin. He has Questions about this permit Phone #: ###-#### Inspection requested via web by Kevin Koomler
|
Final | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Mark Moncarr
|
|
|
Talked to Kevin with Four Star. A final inspection was requested, upon inspection a gas pipe had been installed which affected working clearance of pool panel and related equipment. The general contractor was notified and said gas pipe was moved, but it wasnt. Kevin has tried on many attempts to access property and try to resolve the problem. AS PER General contractor, the gas pipe was moved.
|
ELE-Aging Inspection | 3/28/2017 | 3/28/2017 | 3/29/2017 | | FAIL |
Mark Moncarr
|
|
|
10/18/13 pool was failed and needed corrections. No inspection requested at this time.
|
ELE-Aging Inspection | 8/5/2016 | 8/5/2016 | 8/12/2016 | | CANC |
Eric Story
|
|
|
too busy
|
ELE-Aging Inspection | 4/21/2016 | 4/21/2016 | 4/29/2016 | | CANC |
Eric Story
|
|
|
too busy
|
ELE-Request for Extension | 8/19/2014 | 8/20/2014 | 8/20/2014 | A | PASS |
Rex Boyles
|
|
|
Kevin-###-#### extension granted
|
Final | 10/18/2013 | 10/18/2013 | 10/18/2013 | A | FAIL |
Bob Reichert
|
|
|
elect. final on swimming pool Phone #: ###-#### >> Inspection requested via web by Kevin Koomler called, NEC 110.26 shall provide work space about electrical equipment, will fix and recall
|
Electrical Rough-In | 9/20/2013 | 9/20/2013 | 9/20/2013 | P | PASS |
Bob Reichert
|
|
|
potting compound for light Phone #: ###-#### >> Inspection requested via web by Kevin Koomler potting ok
|
Electrical Rough-In | 8/26/2013 | 8/28/2013 | 8/28/2013 | A | PASS |
Bob Reichert
|
|
|
pool bonding U.G. cover Phone #: ###-#### >> Inspection requested via web by Kevin Koomler pool bond and u/g ok cover
|