Final | 10/22/2013 | 10/23/2013 | 10/23/2013 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Eric Schroeder No card on site final ok
|
Electrical Rough-In | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Eric Schroeder corrections done rough-in ok cover phase 2
|
Electrical Rough-In | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Eric Schroeder Not all corrections completed
|
Electrical Rough-In | 9/24/2013 | 9/25/2013 | 9/25/2013 | A | DONE |
Daryl DeGrange
|
|
|
see final, sign no longer exist
|
Electrical Rough-In | 9/5/2013 | 9/6/2013 | 9/6/2013 | A | PASS |
Daryl DeGrange
|
|
|
Please contact Eric at ###-#### before starting inspection. Phone #: ###-#### >> Inspection requested via web by Eric Schroeder rough-in ok cover
|
Final | 9/5/2013 | 9/6/2013 | 9/5/2013 | A | CANC |
Daryl DeGrange
|
|
|
Please call Eric @ ###-#### before inspection. Phone #: ###-#### >> Inspection requested via web by Eric Schroeder Inspection cancelled from web by: Eric Schroeder
|