Final | 10/11/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Tate No card posted. Final ok
|
Electrical Rough-In | 10/7/2013 | 10/8/2013 | 10/8/2013 | A | PASS |
Bob Reichert
|
|
|
Above ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Clint Tate corrections made, ok cover ceiling
|
Electrical Rough-In | 10/4/2013 | 10/7/2013 | 10/7/2013 | A | FAIL |
Bob Reichert
|
|
|
Jeff Flechsing is contact. Above ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Clint Tate called, left message, left correction notice, BCC ceiling has open box, tiles installed, remove for inspection, low voltage on grid and tiles, remove abandoned lv cable, close open ko in box
|
Electrical Rough-In | 9/4/2013 | 9/5/2013 | 9/5/2013 | P | PASS |
Rock A. Hudson
|
|
|
Jeff Pierce on site. Phone #: ###-#### >> Inspection requested via web by Clint Tate Wall rough in ok cover
|