Final | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PASS |
Daryl DeGrange
|
|
|
Contact: Casey Fouts Phone #: ###-#### >> Inspection requested via web by Deb Gooden Verifed dept of trench,corrections done, final ok
|
Final | 9/18/2013 | 9/18/2013 | 9/18/2013 | P | CANC |
Doug A Poedy
|
|
|
Contact: Casey Fouts Phone #: ###-#### >> Inspection requested via web by Deb Gooden. Rescheduled
|
Final | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | FAIL |
Daryl DeGrange
|
|
|
your contact name will be Casey Fouts. Thank you. Phone #: ###-#### >> Inspection requested via web by Deb Gooden Not all corrections completed
|
Final | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Contact: Casey Fouts Phone #: ###-#### >> Inspection requested via web by Deb Gooden NEC 250.32 Requires a service to a unattached building to have main breaker and 250.52 single ground rod. NEC 250.52(A)(2) Shall bond metal structure
|