Final | 9/26/2013 | 9/26/2013 | 9/26/2013 | A | PASS |
Doug A Poedy
|
|
|
ready for a final call corey with questions Phone #: ###-#### >> Inspection requested via web by Don Lustig
|
Electrical Rough-In | 9/23/2013 | 9/24/2013 | 9/24/2013 | A | PASS |
Bob Reichert
|
|
|
ceiling cover is needed call corey with questions thanks Phone #: ###-#### >> Inspection requested via web by Don Lustig called, ok cover ceiling
|
Electrical Rough-In | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PASS |
Bob Reichert
|
|
|
wall rough in call steve with questions thanks Phone #: ###-#### >> Inspection requested via web by Don Lustig walls only ok cover
|