Final | 12/10/2013 | 12/10/2013 | 12/10/2013 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Matthew Dunay ok final
|
Final | 12/5/2013 | 12/6/2013 | 12/6/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Final Inspection for solar PV array on back southern roof. Inverter and main back-fed breaker is in garage. AC disconnect is by the main meter. Phone #: ###-#### >> Inspection requested via web by Matthew Dunay NEC 408.7 Unused openings for circuit breakers
|
Electrical Rough-In | 9/17/2013 | 9/18/2013 | 9/18/2013 | A | PASS |
Bob Reichert
|
|
|
chris Phone #: ###-#### check ground termination at concrete encased electrode (pool room) at final, ri ok
|
Electrical Rough-In | 9/16/2013 | 9/17/2013 | 9/17/2013 | P | NR |
Bob Reichert
|
|
|
Solar PV rough in please-Chris Phone #: ###-#### called, told ground shall go to gec for service, not sub-panel, IPCO and NEC requires disconnect by service disconnect along with placards to identify sources and disconnects
|