Permanent Service | 9/17/2013 | 9/18/2013 | 9/18/2013 | A | PASS |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot. P/S Connect ok.
|
Final | 9/18/2013 | 9/18/2013 | 9/18/2013 | P | PASS |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot
|
Permanent Service | 9/16/2013 | 9/17/2013 | 9/17/2013 | A | FAIL |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot. Mast only has 1 or 2 theads holding into the hub.
|