Final | 6/3/2014 | 6/4/2014 | 6/4/2014 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### >> Inspection requested via web by George Pascua final ok
|
Rough-In Permanent Service | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by George Pascua Rough in ok cover p/s o/h n ok
|
Rough-In Permanent Service | 9/23/2013 | 9/25/2013 | 9/25/2013 | A | FAIL |
Rock A. Hudson
|
|
|
George Phone #: ###-#### >> Inspection requested via web by George Pascua 310.15 (B)(6)- Table 310.15(B)(6) does not apply in this case for 2 reasons. 1- Cable used to feed panel shall serve 100% of dwellings diversified load. 2. 60 degree columb shall be used because SER cable will be buried i insulation and will not be able to disapate heat. 300.4- SER cable shall be protected from physical damage where it passes through bored hole ablve panel.
|