Final | 5/16/2014 | 5/19/2014 | 5/19/2014 | A | PASS |
Bob Reichert
|
|
|
Sin Ming Phone #: ###-#### installation complete, ok final
|
Conference | 5/7/2014 | 5/8/2014 | 5/8/2014 | A | DONE |
Bob Reichert
|
|
|
Sinming Phone #: ###-#### talked about clearance and installation for solar equipment, extra disconnect desired by homeowner
|
Conference | 4/25/2014 | 4/28/2014 | 4/28/2014 | A | DONE |
Bob Reichert
|
|
|
sin ming Phone #: ###-#### talked about solar system installation and grounding
|
Conference | 4/25/2014 | 4/25/2014 | 4/25/2014 | P | DONE |
Bob Reichert
|
|
|
sin ming - please call 1/2 hr prior so he can meet there Phone #: ###-#### called, left message, owner called later, talked about main electrode for grounding frames of solar array, will recall for further discussion
|
Conference | 9/24/2013 | 10/2/2013 | 10/2/2013 | P | DONE |
Bob Reichert
|
|
|
requests after 9 - Sin Ming Phone #: ###-#### talked about installing solar system, owner to study NEC 690
|