Final | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Rock A. Hudson
|
|
|
Contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell Final ok
|
Electrical Rough-In | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | PASS |
Rex Boyles
|
|
|
Contact is Alan Krishnek ###-#### Phone #: ###-#### Inspection requested via web by Scott Campbell de-contamination room r/i ok 100% (as per pictures)
|
Electrical Rough-In | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | CANC |
Rock A. Hudson
|
|
|
Clean work area grid rough in ok cover
|
Final | 11/3/2014 | 11/4/2014 | 11/4/2014 | A | PART |
Rock A. Hudson
|
|
|
Contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell Physician's lounge, phase 3 PACU, decontamination room ok occupy
|
Conference | 11/3/2014 | 11/4/2014 | 11/4/2014 | A | DONE |
Rock A. Hudson
|
|
|
Contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell New inspector for job. Conference to catch up on what has been inspected up to this point
|
Electrical Rough-In | 10/15/2014 | 10/15/2014 | 10/15/2014 | P | PASS |
Bob Reichert
|
|
|
Ceiling cover inspection. Contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell ok cover ceiling for pacu, anesthesia, lounge areas only
|
Electrical Rough-In | 10/1/2014 | 10/2/2014 | 10/2/2014 | P | PASS |
Daryl DeGrange
|
|
|
Alan Phone #: ###-#### rough-in ok cover office anf storage room
|
Final | 9/26/2014 | 9/29/2014 | 9/29/2014 | P | PART |
Daryl DeGrange
|
|
|
This is a partial final - contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell Sterilization storage partial final ok
|
Electrical Rough-In | 9/25/2014 | 9/26/2014 | 9/26/2014 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling cover inspection. Contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell rough-in ok cover ceiling grid sterilization storage
|
Electrical Rough-In | 9/17/2014 | 9/18/2014 | 9/18/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell rough-in ok cover physicians lounge, sterile storage
|
Electrical Rough-In | 9/15/2014 | 9/16/2014 | 9/16/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell PAC-U Phase 3 Rough-in ok cover OP headwalls
|
Electrical Rough-In | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PART |
Daryl DeGrange
|
|
|
Ceiling inspection - contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell Partial ceiling cover for Lobby Receptionist area
|
Final | 8/15/2014 | 8/15/2014 | 8/15/2014 | P | PART |
Daryl DeGrange
|
|
|
Partial final - locker rooms. Contact is Alan Krishnek ###-#### Phone #: ###-#### Inspection requested via web by Scott Campbell Parial final ok for locker and storage rooms
|
Final | 8/5/2014 | 8/6/2014 | 8/6/2014 | P | PART |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek. This is a partial final in the PACU unit. Phone #: ###-#### Inspection requested via web by Scott Campbell Partial final ok PACU
|
Electrical Rough-In | 8/6/2014 | 8/6/2014 | 8/6/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek. This is a partial final in the PACU unit. Phone #: ###-#### Inspection requested via web by Scott Campbell Rough-in ok cover lobby walls
|
Electrical Rough-In | 8/4/2014 | 8/4/2014 | 8/4/2014 | P | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection. Contact is Alan Krishnek Phone #: ###-#### Inspection requested via web by Scott Campbell rough-in cover ceiling grid purchasing and storage
|
Electrical Rough-In | 7/28/2014 | 7/28/2014 | 7/28/2014 | P | PASS |
Daryl DeGrange
|
|
|
ceiling cover inspection - contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover pac-u ceiling grid
|
Electrical Rough-In | 7/25/2014 | 7/28/2014 | 7/28/2014 | A | NR |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek - ceiling inspection Phone #: ###-#### >> Inspection requested via web by Scott Campbell not ready
|
Electrical Rough-In | 7/15/2014 | 7/16/2014 | 7/16/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover purchaseing and locker room
|
Electrical Rough-In | 7/2/2014 | 7/3/2014 | 7/3/2014 | A | PASS |
Daryl DeGrange
|
|
|
ug & r/i -- Alan Phone #: ###-#### rough-in ok cover Generator underground, Pac-u soffits and head wall
|
Electrical Rough-In | 6/30/2014 | 7/1/2014 | 6/30/2014 | A | PASS |
Daryl DeGrange
|
|
|
Underground inspection. Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok pour generator pad
|
Final | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | PASS |
Daryl DeGrange
|
|
|
Fixed smoke on dedicated circuit in exterior panel Phone #: ###-#### >> Inspection requested via web by TOM BICANDI correction done. final ok
|
Final | 6/23/2014 | 6/24/2014 | 6/24/2014 | P | PART |
Bob Reichert
|
|
|
Partial final inspection. Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell 4 patient rooms, 1 lab, 1 storage only ok final
|
Electrical Rough-In | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek - ceiling cover inspection Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover ceiling grid interview stations
|
Electrical Rough-In | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Pac-U head wall rough-in ok cover
|
Electrical Rough-In | 6/13/2014 | 6/16/2014 | 6/16/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover walls pac-u patent care unit
|
Electrical Rough-In | 6/10/2014 | 6/11/2014 | 6/11/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover ceiling grid in patient care rooms (4) South wall of Pack-U Area
|
Electrical Rough-In | 5/19/2014 | 5/21/2014 | 5/21/2014 | A | CANC |
Rex Boyles
|
|
|
Contact is Alan Krishnek ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell cancelled as per alan
|
Electrical Rough-In | 5/19/2014 | 5/20/2014 | 5/20/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover phase 2 Lobby
|
Electrical Rough-In | 5/15/2014 | 5/16/2014 | 5/16/2014 | A | PASS |
Daryl DeGrange
|
|
|
Alan Phone #: ###-#### Rough-in ok cover 4 patient care areas
|
Electrical Rough-In | 5/8/2014 | 5/8/2014 | 5/8/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover phase 2 Lab and storage room
|
Final | 4/15/2014 | 4/16/2014 | 4/16/2014 | P | PART |
Daryl DeGrange
|
|
|
Partial area final - contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Phase one, Temporary occupancy ok
|
Electrical Rough-In | 4/10/2014 | 4/11/2014 | 4/11/2014 | P | PASS |
Daryl DeGrange
|
|
|
Glenn Phone #: ###-#### Rough-in ok cover ceiling grid area C
|
Electrical Rough-In | 4/9/2014 | 4/10/2014 | 4/10/2014 | A | NR |
Daryl DeGrange
|
|
|
Ceiling rough in inspection. Contact is Alan Krishnek ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell not ready
|
Electrical Rough-In | 4/8/2014 | 4/9/2014 | 4/9/2014 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover cafeteria ceiling grid
|
Electrical Rough-In | 4/3/2014 | 4/4/2014 | 4/4/2014 | A | PART |
Rock A. Hudson
|
|
|
Ceiling cover inspection contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Grid ceilings, OR coriidor, sterile passage, storage, consult, baths off lobby, soiled and clean rooms rough in ok cover
|
Electrical Rough-In | 3/31/2014 | 3/31/2014 | 3/31/2014 | P | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection. Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover ceiling grid in areas A and B
|
Final | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | PART |
Daryl DeGrange
|
|
|
Partial final - contact Alan krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Temporary occupancy for patient care ok
|
Electrical Rough-In | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Daryl DeGrange
|
|
|
contact Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover cafeteria soffit
|
Electrical Rough-In | 3/24/2014 | 3/24/2014 | 3/24/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover ceiling grid in OR6 and Walls in cafeteria
|
Electrical Rough-In | 3/20/2014 | 3/21/2014 | 3/21/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek. Ceiling inspection Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover ceiling grid, patient care addition
|
Electrical Rough-In | 3/19/2014 | 3/20/2014 | 3/20/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover OR 5 hard lid ceiling, Nurses station soffit
|
Electrical Rough-In | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover hallway near OR4
|
Electrical Rough-In | 3/13/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover hard lid OR4
|
Electrical Rough-In | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | PART |
Doug A Poedy
|
|
|
Contac is Alan Krishnek ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell. Soiled and clean room walls ok.
|
Electrical Rough-In | 3/10/2014 | 3/11/2014 | 3/11/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover underground nurse stations, walls in area C1
|
Electrical Rough-In | 3/5/2014 | 3/6/2014 | 3/6/2014 | P | PASS |
Daryl DeGrange
|
|
|
This will be both a rough in and a ceiling cover inspection. Contact is Alan Krishnek. Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover walls in pre-op, ceiling grid in patient expansion
|
Electrical Rough-In | 3/3/2014 | 3/4/2014 | 3/4/2014 | A | PASS |
Rock A. Hudson
|
|
|
CONTACT IS ALAN KRISHNEK ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell Sub-sterile, clean and soiled storage west wall rough in ok cover
|
Electrical Rough-In | 2/27/2014 | 2/28/2014 | 2/28/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover corridor hallway, time clocks
|
Electrical Rough-In | 2/24/2014 | 2/25/2014 | 2/25/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover engineering room
|
Electrical Rough-In | 2/14/2014 | 2/18/2014 | 2/18/2014 | A | PART |
Doug A Poedy
|
|
|
Contact is Alan Krishnek ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell. Walls ok. highlighted on plans.
|
Electrical Rough-In | 2/10/2014 | 2/11/2014 | 2/11/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover as per highlighted on city plans
|
Electrical Rough-In | 2/7/2014 | 2/10/2014 | 2/10/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover southwest exterior wall to east side of vestibule, (sheetrock)top out east hallway from panelboards east to end of that wall, eastside only. Top out south hallway,both sides
|
Electrical Rough-In | 1/31/2014 | 2/3/2014 | 2/3/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover walls west of hallway
|
Final | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | PART |
Daryl DeGrange
|
|
|
This is a PARTIAL final request for an Admin Area. Contact is Alan Krishnek. Phone #: ###-#### >> Inspection requested via web by Scott Campbell partial final ok
|
Electrical Rough-In | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok one side bump-out wall in 4 locations five feet high.
|
Electrical Rough-In | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact on site is Glenn Corbiel ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok one side service room and four foot off ceiling in wall corridor
|
Electrical Rough-In | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PASS |
Daryl DeGrange
|
|
|
andy Phone #: ###-#### rough-in ok cover hall soffit for pendent fixtures
|
Electrical Rough-In | 1/15/2014 | 1/15/2014 | 1/15/2014 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover wall at service panels and ok cover wall for frame out
|
Final | 1/10/2014 | 1/13/2014 | 1/13/2014 | A | PART |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek - this is a PARTIAL final for one area of the work Phone #: ###-#### >> Inspection requested via web by Scott Campbell partial final for office area only
|
Electrical Rough-In | 1/10/2014 | 1/13/2014 | 1/13/2014 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover ceilings in bathrooms
|
Electrical Rough-In | 1/8/2014 | 1/8/2014 | 1/8/2014 | P | PASS |
Daryl DeGrange
|
|
|
Ceiling rough in inspection. Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover ceiling grid x-ray room
|
Electrical Rough-In | 12/30/2013 | 1/3/2014 | 1/3/2014 | A | PASS |
Daryl DeGrange
|
|
|
contact is Alan Krishnek ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover walls east half, hard lids in bathrooms, hallway soffits
|
Electrical Rough-In | 12/30/2013 | 12/31/2013 | 12/31/2013 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover ceiling grid administration offices
|
Electrical Rough-In | 12/23/2013 | 12/26/2013 | 12/26/2013 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover west half walls , service room underground
|
Conference | 12/19/2013 | 12/19/2013 | 12/19/2013 | P | DONE |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Discussed with electrical contractor and general contractor no one side or insulation without prior authorization for cover
|
Electrical Rough-In | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell X-ray room rough-in ok cover underground and walls
|
Electrical Rough-In | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | PASS |
Bob Reichert
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell 3 rooms, walls only anop
|
Electrical Rough-In | 10/31/2013 | 11/1/2013 | 11/1/2013 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Alan Krishnek Phone #: ###-#### >> Inspection requested via web by Scott Campbell Rough-in ok cover walls as per highlighted in blue and dated on city aproved plans.
|