Final | 8/29/2017 | 8/29/2017 | 8/30/2017 | A | PASS |
James Ady
|
|
|
Ready for final Fuel station only Final ok
|
ELE-Aging Inspection | 8/24/2017 | 8/24/2017 | 8/29/2017 | | DONE |
James Ady
|
|
|
Talked to John. Final is scheduled
|
Electrical Rough-In | 10/23/2013 | 10/24/2013 | 10/24/2013 | P | PASS |
Bob Reichert
|
|
|
Need an ok to cover the trench. Phone #: ###-#### >> Inspection requested via web by John Edwards ok cover u/g store to pump island
|