Final | 10/28/2013 | 10/29/2013 | 10/29/2013 | A | PASS |
Daryl DeGrange
|
|
|
GREG Phone #: ###-#### corrections done, p/s o/h rec ok
|
Final | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | NH |
Daryl DeGrange
|
|
|
Greg Phone #: ###-#### No access, contact person not available
|
Permanent Service | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Abel Phone #: ###-#### 230.41- Service entrance conductors shall be insulated. 250.24- Grounding electode conductors shall terminate at same terminal or bus bar as grounded conductor. 250.64- Metal piping system shall be bonded, cold first then hot. 250.80- Equiptment bonding strap shall be installed. Annex C Table C1- Max # of conductors in EMT 3 THW condutors from disconnect to sub panel.
|
Permanent Service | 10/23/2013 | 10/23/2013 | 10/23/2013 | P | CANC |
Bob Reichert
|
|
|
Greg Phone #: ###-#### see conference
|
Conference | 10/23/2013 | 10/23/2013 | 10/23/2013 | P | DONE |
Bob Reichert
|
|
|
Greg Phone #: ###-#### met owner, talked about ground rods, continuous gec, provide service disconnect, wire sub-panel per NEC, gas meter shall not be in front of meter
|