Final | 12/20/2016 | 12/21/2016 | 12/21/2016 | A | PASS |
Tom Saunders
|
|
|
Matt Phone #: ###-####...
corrections made ok to final
|
Final | 12/19/2016 | 12/20/2016 | 12/20/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Matt Phone #: ###-####-please call with a meet time Homeowner covered with drywall prior to approval. Only items unable to confirm completed are NM abrasion protection and securing near boxes. After asking owner questions of how he completed corrections I believe them to be completed. 110.3- Fittings for EMT installed on water heater shall be listed for EMT. 422.30- A disconnecting means shall be installed on water heater circuit. 110.25 lockout acceptable. Complete and call for final
|
Final | 10/31/2016 | 11/2/2016 | 11/2/2016 | A | FAIL |
Rock A. Hudson
|
|
|
Matt Phone #: ###-#### 210.8- If basement remains unfinished all receptacle outlets shall be GFCI protected. 210.11- Bathroom receptacle outlets shall be on a dedicated 20 amp that shall serve no others. Laundry circuit shall be 20 amp dedicated and shall serve no others. Kitchen circuits shall only serve kitchen areas. 210.12- All outlets in bedroom areas shall have AFCI protection. Dn bed, smokes. 300.4- Where MN cable enters junction boxes on cans abrasion protection needed. 314.17- NM cable sheath shall enter box at least 1/4" before removed. 334.30- NM cable shall be secured with in 12" of boxes, cans and smokes. basement.
|
Conference | 10/22/2013 | 10/23/2013 | 10/23/2013 | P | DONE |
Daryl DeGrange
|
|
|
Matt Phone #: ###-#### Discussed with home owner electrical requirements for service upgrade and general electrical remodel
|