Final | 4/18/2014 | 4/18/2014 | 4/18/2014 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Paige final ok first floor
|
Electrical Rough-In | 3/13/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Paige all receptacles are now hospital grade on 2nd floor except for exam rooms 9,10,11and 12, there was no work in these rooms.. all receptacles on first floor are now hospital grade in exam rooms. rough in ok
|
Electrical Rough-In | 3/13/2014 | 3/14/2014 | 3/13/2014 | A | CANC |
Rex Boyles
|
|
|
hospital grade receptacles in exam rooms that we remodeled call so we can meet you on site Phone #: ###-#### >> Inspection requested via web by Karl Paige Inspection cancelled from web by: Karl Paige
|
Electrical Rough-In | 3/11/2014 | 3/11/2014 | 3/11/2014 | P | FAIL |
Rock A. Hudson
|
|
|
517.18(B)- General care area receptical outlets shall be listed hospital grade type. BCC 4-05-32- Code violations not to be retained, Other areas that have been improved in general care areas shall also have listed hospital grade receptical outlets installed.
|
Electrical Rough-In | 2/27/2014 | 2/27/2014 | 2/27/2014 | A | PASS |
Rex Boyles
|
|
|
temporary occupancy for phase 2 on first floor so tenant can move from phase 3 area into phase 2 area Phone #: ###-#### >> Inspection requested via web by Karl Paige install blank plate at existing toilet and either GFI or blank plate at box within 6 feet of sink in exam room before final inspection is called in.
|
Electrical Rough-In | 2/24/2014 | 2/24/2014 | 2/24/2014 | P | PASS |
Rex Boyles
|
|
|
ceiling cover Phone #: ###-#### >> Inspection requested via web by Karl Paige ceiling ok for cover
|
Electrical Rough-In | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | PART |
Rock A. Hudson
|
|
|
ceiling cover 1st floor Phone #: ###-#### >> Inspection requested via web by Karl Paige all ok except open j box in waiting room and strapping of mc cable within 12" of box and seismic on fixtures in waiting room 132. ok for borders in ceiling.
|
Electrical Rough-In | 2/20/2014 | 2/20/2014 | 2/20/2014 | P | FAIL |
Bob Reichert
|
|
|
ceiling cover first floor Phone #: ###-#### >> Inspection requested via web by Karl Paige called, told to see on-line items to correct, did ok part ceiling by reception desk only, shall close open box, add exrension rings, staple mc, emt, remove abandoned cable, provide ko seal, add seismic wires, BCC no violations shall be retained
|
Electrical Rough-In | 1/28/2014 | 1/28/2014 | 1/28/2014 | A | PASS |
Rock A. Hudson
|
|
|
1st floor wall cover Phone #: ###-#### >> Inspection requested via web by Karl Paige Wall rough in ok cover
|
Electrical Rough-In | 1/5/2014 | 1/6/2014 | 1/6/2014 | A | CANC |
Rock A. Hudson
|
|
|
final for phase 1 of 2 phases Phone #: ###-#### >> Inspection requested via web by Karl Paige Needed temp final for phase 1
|
Final | 1/6/2014 | 1/6/2014 | 1/6/2014 | P | PART |
Rock A. Hudson
|
|
|
final for phase 1 of 2 phases Phone #: ###-#### >> Inspection requested via web by Karl Paige Basement and 2nd floor ok occupy temp final ok
|
Electrical Rough-In | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | PASS |
Rock A. Hudson
|
|
|
ceiling cover inspection basement Phone #: ###-#### >> Inspection requested via web by Karl Paige Basement ceiling rough in ok cover
|
Electrical Rough-In | 12/29/2013 | 12/30/2013 | 12/30/2013 | A | FAIL |
Daryl DeGrange
|
|
|
ceiling cover 2nd floor and basement Phone #: ###-#### >> Inspection requested via web by Karl Paige Basement level NEC 800.25 The accessible portionof abandoned communnication cables shall be removed. Support MC cables off grid. Support j-boxes in hallway
|
Electrical Rough-In | 12/30/2013 | 12/30/2013 | 12/30/2013 | P | PASS |
Daryl DeGrange
|
|
|
ceiling cover 2nd floor Phone #: ###-#### >> Inspection requested via web by Karl Paige rough-in ok cover ceiling grid
|
Electrical Rough-In | 11/4/2013 | 11/4/2013 | 11/4/2013 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Paige Basement and 2nd floor wall rough in ok cover
|