Final | 11/27/2013 | 11/27/2013 | 11/27/2013 | P | PASS |
Daryl DeGrange
|
|
|
The faucet has been bonded. please call Carlos if there are any more problems. Thank you. Phone #: ###-#### >> Inspection requested via web by David Mackey final ok
|
Final | 11/25/2013 | 11/25/2013 | 11/25/2013 | P | FAIL |
Daryl DeGrange
|
|
|
Please final. Call Dave if you have any questions Phone #: ###-#### >> Inspection requested via web by David Mackey NEC 680.26 Equipotential bonding (water faucet)
|
Electrical Rough-In | 11/25/2013 | 11/25/2013 | 11/25/2013 | P | PASS |
Daryl DeGrange
|
|
|
Please final. Call Dave if you have any questions Phone #: ###-#### >> Inspection requested via web by David Mackey rough-in ok cover last portion of trench
|
Permanent Service | 11/20/2013 | 11/20/2013 | 11/20/2013 | P | PASS |
Daryl DeGrange
|
|
|
CINDY Phone #: ###-#### p/s u/g rec ok ETL listed hot tub on site
|