Final | 12/23/2013 | 12/23/2013 | 12/23/2013 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov final ok
|
Rough-In Permanent Service | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov Duplicate rough-in p/s u/g rec ok
|
Rough-In Permanent Service | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov corrections done, rough-in p/s u/g rec ok
|
Rough-In Permanent Service | 12/2/2013 | 12/2/2013 | 12/2/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov NEC 250 Requires service to be connected to concrete encased electrode. NEC 210.52(H) Hallways over 10ft. Require a receptacle
|