ELE-Aging Inspection | 10/25/2017 | 10/25/2017 | 10/26/2017 | | PASS |
Tom Saunders
|
|
|
see final inspection
|
Final | 10/26/2017 | 10/26/2017 | 10/26/2017 | A | PASS |
Tom Saunders
|
|
|
job complete...ok to final
|
Permanent Service | 12/2/2013 | 12/3/2013 | 12/3/2013 | A | PASS |
Daryl DeGrange
|
|
|
Tim Phone #: ###-#### corrections done, p/s o/h rec ok
|
Permanent Service | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | FAIL |
Daryl DeGrange
|
|
|
Tim Phone #: ###-#### NEC 250.52 The electrodes shall be installed such that at least 8ft. of the lenght is in contact with the soil. NEC 250.53(C) Bonding jumper NEC 300.4 NM cable Protection fron phyical damage, not less than 1 1/4 from edge of framing member NEC 334.30 NM cable shall be secured within 12 in. of panel
|
Permanent Service | 11/26/2013 | 11/27/2013 | 11/27/2013 | A | FAIL |
Daryl DeGrange
|
|
|
tim Phone #: ###-#### Reconnect of power requires service grounding be upgraded to 2008 codes
|