Final | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | PASS |
Rock A. Hudson
|
|
|
darren Phone #: ###-#### Final ok
|
Final | 2/24/2014 | 2/24/2014 | 2/24/2014 | P | PART |
Bob Reichert
|
|
|
Carl Phone #: ###-#### called, NEC 408.4 shall provide circuit directory, 210.8(B)(5) shall provide gfci for receptacle by mop sink, 253,30(A) shall strap pvc within 3' of termination, 110.26 shall provide work space about equipment, 314.25 shall provide covers for boxes, shall provide correct polarity for receptacles, signed t/o card
|
Electrical Rough-In | 1/27/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Bob Reichert
|
|
|
Darren Phone #: ###-#### ri ok new part only
|
Conference | 1/15/2014 | 1/16/2014 | 1/16/2014 | A | DONE |
Bob Reichert
|
|
|
carl - 10:00 am Phone #: ###-#### talked about NEC articles for gutters and pull boxes, told would allow to run wireway under panel and for small wiring ok use nipples, will call for u/g inspection
|
Permanent Service | 1/13/2014 | 1/14/2014 | 1/14/2014 | P | FAIL |
Bob Reichert
|
|
|
Darren Phone #: ###-#### shall add bond bushing, provide correct size j-box below service panel per NEC 250.92 and 314.28
|
Electrical Rough-In | 12/3/2013 | 12/4/2013 | 12/4/2013 | A | PASS |
Bob Reichert
|
|
|
carl Phone #: ###-#### concrete encased electrode ok pour
|
Electrical Rough-In | 12/2/2013 | 12/3/2013 | 12/3/2013 | A | PASS |
Bob Reichert
|
|
|
underground & conference - Carl Phone #: ###-#### looked at u/g , explained IPCO responsible until service point for new service, they will put in concrete encased electrode, install new sub-panels, they will clean up existing code violations in existing bar
|