Final | 12/11/2013 | 12/12/2013 | 12/12/2013 | A | PASS |
Daryl DeGrange
|
|
|
Thanks Darrell! TW. Phone #: ###-#### >> Inspection requested via web by Stephen Kren final ok
|
Permanent Service | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | PASS |
Daryl DeGrange
|
|
|
An additional Neutral bus has been installed, any concerns please call, thanks, TW. ACCESS CODE is 6417 Phone #: ###-#### >> Inspection requested via web by Stephen Kren p/s o/h rec ok
|
Permanent Service | 12/9/2013 | 12/9/2013 | 12/10/2013 | P | FAIL |
Daryl DeGrange
|
|
|
The access code is 6417, thanks, TW. Phone #: ###-#### >> Inspection requested via web by Stephen Kren NEC 408.41 Each grounded conductors shall terminate within the panelboard in an individual terminal that is not also used for another conductor
|
Permanent Service | 12/4/2013 | 12/5/2013 | 12/5/2013 | P | FAIL |
Daryl DeGrange
|
|
|
We are upgrading the service on this home, I was hoping to get an inspection mid afternoon tomorrow so Idaho Power wont have any issues powering the home back up, please call for details, ###-####, thanks, Terry W. Phone #: ###-#### Phone #: ###-#### >> Inspection requested via web by Stephen Kren NEC 240.24 (A) service height. Overcurrent devices shall be readily accessible an shall be installed so that the center grip of the operating handle of the switch or breaker, when in its highest position,is not more than 6ft 7in. above floor or working platform.
|
Permanent Service | 12/3/2013 | 12/4/2013 | 12/4/2013 | P | CANC |
Daryl DeGrange
|
|
|
We are upgrading the service on this home, I was hoping to get an inspection mid afternoon tomorrow so Idaho Power wont have any issues powering the home back up, please call for details, ###-####, thanks, Terry W. Phone #: ###-#### >> Inspection requested via web by Stephen Kren Inspection cancelled from web by: Stephen Kren
|