Final | 2/18/2014 | 2/19/2014 | 2/19/2014 | A | PASS |
Daryl DeGrange
|
|
|
1st thing in morning please.(Doug) Toby Phone #: ###-#### >> Inspection requested via web by Sean DeLacy correction done final ok
|
Final | 2/17/2014 | 2/18/2014 | 2/18/2014 | A | CANC |
Doug A Poedy
|
|
|
Toby Phone #: ###-#### >> Inspection requested via web by Sean DeLacy. Rescheduled.
|
Final | 2/12/2014 | 2/13/2014 | 2/13/2014 | A | FAIL |
Daryl DeGrange
|
|
|
Toby. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Two receptacle on circuit A1-39 have open neutrals. Common trip handle ties for full boat circuitry
|
Electrical Rough-In | 1/28/2014 | 1/29/2014 | 1/29/2014 | A | PASS |
Daryl DeGrange
|
|
|
Toby. Ceiling Cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy correction done, rough-in ok cover ceiling grid
|
Electrical Rough-In | 1/20/2014 | 1/21/2014 | 1/21/2014 | A | FAIL |
Daryl DeGrange
|
|
|
Toby. Ceiling cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy NEC 800.25 Cables shall be supported off ceiling grid. Abandoned cable shall be removed. Cables for future use shall be tagged and indentified.
|
Electrical Rough-In | 12/19/2013 | 12/23/2013 | 12/23/2013 | A | PASS |
Daryl DeGrange
|
|
|
Toby. Wall cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough-in ok cover walls
|