Final | 4/15/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Rex Boyles
|
|
|
CONTACT: DERRICK KAMPER Phone #: ###-#### Inspection requested via web by Deb Gooden final ok checked generator, chillers, air handelers in IT and basement MSB and associated panels
|
Electrical Rough-In | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | PASS |
Rex Boyles
|
|
|
Contact: Jeremiah Goins Phone #: ###-#### Inspection requested via web by Deb Gooden 4th floor r/i walls ok except conference rm, bathrooms and elevator lobby
|
Final | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | PART |
Rex Boyles
|
|
|
Contact: Jeremiah Goins Phone #: ###-#### Inspection requested via web by Deb Gooden partial final for basement. Final ok in breakroom, training rm. and corridor only.
|
Permanent Service | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | CANC |
Rex Boyles
|
|
|
Please contact Jeremiah Goins on site at ###-#### Phone #: ###-#### Inspection requested via web by Deb Gooden needed r/i for performance test completion
|
Electrical Rough-In | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Rex Boyles
|
|
|
Please contact Jeremiah Goins on site at ###-#### Phone #: ###-#### Inspection requested via web by Deb Gooden performance test completed (p/s already passed)
|
Electrical Rough-In | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Rex Boyles
|
|
|
Please contact Jeremiah Goins on site at ###-#### Phone #: ###-#### Inspection requested via web by Deb Gooden performance test completed
|
Permanent Service | 6/17/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Daryl DeGrange
|
|
|
Contact: Jeremiah Goins, Late afternoon (3:00) if possible please. Phone #: ###-#### Inspection requested via web by Deb Gooden NEC 230.95(C) Five working days to complete Performance Testing p/s u/g n ok
|
Electrical Rough-In | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | PASS |
Daryl DeGrange
|
|
|
Contact: Jeremiah Goins - Late morning, close to noon if possible please Phone #: ###-#### Inspection requested via web by Deb Gooden rough-in ok cover basement ceiling grid all except electrical room.
|
Electrical Rough-In | 6/2/2015 | 6/3/2015 | 6/3/2015 | A | PASS |
Rex Boyles
|
|
|
Contact: Jeremiah Goins, underground inspection - 9:00 am if possible please Phone #: ###-#### Inspection requested via web by Deb Gooden generator pad grounding electrode conductor r/i ok
|
Electrical Rough-In | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Rex Boyles
|
|
|
Ceiling -Jeremiah Phone #: ###-#### r/i ok training room ceiling in bsmt.
|
Electrical Rough-In | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Rex Boyles
|
|
|
Contact: Jeremiah Goins... late afternoon (2:00 or 3:00) if possible please Phone #: ###-#### Inspection requested via web by Deb Gooden r/i ok bathrooms and soffits
|
Electrical Rough-In | 4/28/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Daryl DeGrange
|
|
|
Contact: Jeremiah Goins. Would like 2:00 or close if possible please Phone #: ###-#### Inspection requested via web by Deb Gooden rough-in ok exterior underground
|
Electrical Rough-In | 4/21/2015 | 4/22/2015 | 4/22/2015 | A | PASS |
Daryl DeGrange
|
|
|
Contact: Jeremiah Goins Phone #: ###-#### Inspection requested via web by Deb Gooden Partial rough-in ok cover break room and east of break room
|
Conference | 3/30/2015 | 3/31/2015 | 3/31/2015 | A | DONE |
Rex Boyles
|
|
|
Contact: Jeremiah Goins Phone #: ###-#### Inspection requested via web by Deb Gooden discuss fire pump electrical installation without having the required 2 hr protection.Problem not resolved yet
|
Conference | 3/26/2015 | 3/26/2015 | 3/26/2015 | P | DONE |
Rex Boyles
|
|
|
Contact: Jeremiah Goins Phone #: ###-#### Inspection requested via web by Deb Gooden discuss new service and fire pump issues. Return tommarrow for meeting
|
Electrical Rough-In | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Rex Boyles
|
|
|
Contact: Jeremiah Goins, underground inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden under slab r/i ok (bsmt. area) (superintendent :John)
|