Final | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | PASS |
Daryl DeGrange
|
|
|
final for phase 2 Phone #: ###-#### >> Inspection requested via web by ron spen job complete, final ok
|
Final | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PART |
Daryl DeGrange
|
|
|
Ron-only on 1st phase area please Phone #: ###-#### Partial final for phase 1 south playroom
|
Electrical Rough-In | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PASS |
Daryl DeGrange
|
|
|
this is for rough-in on phase 2 Phone #: ###-#### >> Inspection requested via web by ron spen cer rough-in ok cover new wall in phase 2
|
Electrical Rough-In | 12/12/2013 | 12/12/2013 | 12/12/2013 | P | PASS |
Daryl DeGrange
|
|
|
ron Phone #: ###-#### rough-in ok cover walls
|
Electrical Rough-In | 12/11/2013 | 12/12/2013 | 12/12/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by ron spen cer NEC 330.12 (1) MC installed subject to physical damage, inside 2x4 channels
|