Final | 1/6/2014 | 1/7/2014 | 1/7/2014 | A | PASS |
Rock A. Hudson
|
|
|
DARREN Phone #: ###-#### Final ok
|
Electrical Rough-In | 1/2/2014 | 1/3/2014 | 1/3/2014 | A | PASS |
Rock A. Hudson
|
|
|
darren Phone #: ###-#### Ceiling rough in ok
|
Electrical Rough-In | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | FAIL |
Bob Reichert
|
|
|
ceiling and partial final // Carl Phone #: ###-#### corrections not made, marked existing correction notice, shall add strapping, clean up low voltage, add seismic wires, told tenant ok cover ceiling except at work area
|
Final | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | FAIL |
Rock A. Hudson
|
|
|
partial final for temp occ // Carl Phone #: ###-#### Ceiling inspection failed and 210.8 All bathroom receptical outlets shall have GFCI protection
|
Electrical Rough-In | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | FAIL |
Rock A. Hudson
|
|
|
carl Phone #: ###-#### All light fixtures shall be supported independant of ceiling grid. Break room 2x4 Flourescent, and recessed cans. 210.8- All bathroom receptical outlets shall have GFCI protection. 314.25- All boxes shall have covers, north office. 362.30- ENT shall have supports not to exceed 3' and be secured with in 3' of boxes.
|
Electrical Rough-In | 12/27/2013 | 12/27/2013 | 12/27/2013 | P | FAIL |
Bob Reichert
|
|
|
Ceiling inspection please-Darren Phone #: ###-#### called, too many violations to list, told contractor to remove tiles where worked and bring up to code, BCC no violations shall be retained, shall close boxes, mount boxes, strap raceways, remove abandoned cable, prepare job for new tenant, and recall
|