Final | 1/12/2017 | 1/13/2017 | 1/13/2017 | A | PASS |
Rock A. Hudson
|
|
|
this permit needs to be finaled for the c of o-final was orignally cancelled-no one called it in-I''m just hoping you can see if it''s good Candy Floor heat inspected on permit ELE14-00656. Final ok
|
Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | CANC |
Eric Story
|
|
|
most of this project is complete-would you mind checking to see if this permit needs finaled? Called and spoke with EC, he has no record of this being called in for inspection. Have talk with permit techs they also do not know who called in this inspection
|
Electrical Rough-In | 1/31/2014 | 2/3/2014 | 2/3/2014 | A | PASS |
Bob Reichert
|
|
|
Unit 2-202 Floor heat rough in. Contact Gil ###-#### Phone #: ###-#### >> Inspection requested via web by Emmet Bushman called, ok cover floor heat
|
Electrical Rough-In | 1/30/2014 | 1/31/2014 | 1/31/2014 | P | CANC |
Bob Reichert
|
|
|
Floor heat inspection. 2-202. Contact Gil ###-####. Phone #: ###-#### >> Inspection requested via web by Emmet Bushman Inspection cancelled from web by: Emmet Bushman
|
Electrical Rough-In | 1/30/2014 | 1/31/2014 | 1/30/2014 | A | CANC |
Bob Reichert
|
|
|
Rough in for floor heat. Call Gil ###-#### for access. unit 2-202 Phone #: ###-#### >> Inspection requested via web by Emmet Bushman Inspection cancelled from web by: Emmet Bushman
|
Electrical Rough-In | 1/3/2014 | 1/6/2014 | 1/6/2014 | A | PASS |
Bob Reichert
|
|
|
Unit 2-202 Contact Gil for access ###-#### Phone #: ###-#### >> Inspection requested via web by Emmet Bushman thermostat ri ok to install floor heat, will see before cover with tile
|