Final | 1/27/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Bob Reichert
|
|
|
Kevin Phone #: ###-#### ok final, signed card
|
Final | 1/22/2014 | 1/22/2014 | 1/22/2014 | P | NR |
Bob Reichert
|
|
|
kevin PLEASE CALL BEFORE GOING OUT Phone #: ###-#### told contractor no final until lv wiring taken care of, electrical installation ok oter than lv
|
Electrical Rough-In | 1/22/2014 | 1/22/2014 | 1/22/2014 | P | PART |
Bob Reichert
|
|
|
kevin Phone #: ###-#### PLEASE CALL BEFORE GOING OUT called, met general, told ok cover some ceiling, but must be able to see lv cables that are abandoned, owner and general to see about re-using and identifiy existing low voltage cable- Note; see rack in nw room and points coiled up in ceiling
|
Electrical Rough-In | 1/17/2014 | 1/21/2014 | 1/21/2014 | A | FAIL |
Bob Reichert
|
|
|
I have the ceiling ready for a cover inspection thanks Phone #: ###-#### >> Inspection requested via web by Kevin Oderkirk called, left correction notice, NEC 362.30(A) shall support ent within 3' of box, 330.30(B) shall support mc within 12" of box, 300.11(A)(B) grid shall not support raceway, raceways shall nor support other raceways, 314.23 shall securely support box in ceiling, 725.25 shall remove abandoned lv cables, BCC no violations shall be retained
|
Electrical Rough-In | 1/14/2014 | 1/14/2014 | 1/14/2014 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Oderkirk walls only ok- NOTE: shall call for ceiling inspection before tiles installed, BCC- No violations shall be retained
|