Final | 1/29/2014 | 1/29/2014 | 1/29/2014 | P | PASS |
Rock A. Hudson
|
|
|
Installed solar PV on roof, AC disconnects located at exterior main panel and meter service. Phone #: ###-#### >> Inspection requested via web by Matthew Dunay Solar Final ok
|
Electrical Rough-In | 1/29/2014 | 1/29/2014 | 1/29/2014 | P | PASS |
Rock A. Hudson
|
|
|
Installed solar PV on roof, AC disconnects located at exterior main panel and meter service. Phone #: ###-#### >> Inspection requested via web by Matthew Dunay Solar rough in ok
|