Final | 2/17/2014 | 2/18/2014 | 2/18/2014 | A | PASS |
Bob Reichert
|
|
|
please call 30 min. prior to inspection Phone #: ###-#### >> Inspection requested via web by John Edwards called, ok final
|
Electrical Rough-In | 2/5/2014 | 2/6/2014 | 2/6/2014 | P | PASS |
Daryl DeGrange
|
|
|
Installation of heat trace for water line. Phone #: ###-#### >> Inspection requested via web by John Edwards Installed to manufactures specks, rough-in ok
|
Electrical Rough-In | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | PASS |
Bob Reichert
|
|
|
Please call John @ ###-#### 30 min prior to inspection. Phone #: ###-#### >> Inspection requested via web by John Edwards ri ok, walls and hard lid
|