Final | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Bob Reichert
|
|
|
Final on IL Garage 1 area A,B, ; C. Building permit number BLD13-00179. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok final, signed card
|
Final | 6/4/2015 | 6/5/2015 | 6/5/2015 | P | PART |
Daryl DeGrange
|
|
|
Final inspection Garage 1 IL areas A, B, ; C. Building permit number BLD13-00179. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum partial final ok
|
Conference | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | DONE |
Bob Reichert
|
|
|
Need consultation on wiring of the main building. Park in lay-down yard area by Petra''s large trailer and call Lonny when on site. Thanks. Phone #: ###-#### >> Inspection requested via web by Lonny Baum talked about mc cable, not ser for feeders, nm in fire rated walls in halls, sump pump sleeve to protect wiring,
|
Electrical Rough-In | 2/12/2014 | 2/13/2014 | 2/13/2014 | A | PASS |
Bob Reichert
|
|
|
Need a uffer in C wing. Any questions please contact Lonny Baum. Phone #: ###-#### >> Inspection requested via web by Vicki Moore ok pour concrete encased electrode, C wing
|
Electrical Rough-In | 2/5/2014 | 2/6/2014 | 2/6/2014 | A | PART |
Bob Reichert
|
|
|
Need an underground inspection. Contact Lonny Baum for information. Phone #: ###-#### >> Inspection requested via web by Tina Payne conduit extension to 1st unit ok
|
Electrical Rough-In | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | PART |
Bob Reichert
|
|
|
Underground inspection needed. If you have any questions please call Lonny Baum. Phone #: ###-#### >> Inspection requested via web by Vicki Moore ok cover u/g from panel area out to drop off part, will see rest later
|